<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body>
    <p>Folks,</p>
    <p>Please find the minutes <a moz-do-not-send="true"
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_January_27,_2021#Minutes">here</a>
      and below.</p>
    <p>  -- Mark</p>
    <p>    _____________________________________________</p>
    <p>
    </p>
    <div id="globalWrapper">
      <div id="column-content">
        <div id="content" class="mw-body" role="main">
          <h2 id="firstHeading" class="firstHeading" lang="en"><span
              dir="auto">GlueX TOF Meeting, January 27, 2021, </span><span
              class="mw-headline" id="Minutes">Minutes</span></h2>
          <div id="bodyContent" class="mw-body-content">
            <div id="mw-content-text" dir="ltr" class="mw-content-ltr"
              lang="en">
              <p>Present: Eugene Chudakov, Mark Ito (chair), Sasha
                Ostrovidov, Susan Schadmand, Beni Zihlmann
              </p>
              <p>There is a <a rel="nofollow" class="external text"
                  href="https://bluejeans.com/s/8GZxYxK2JpK/">recording
                  of this meeting</a>. Log into the <a rel="nofollow"
                  class="external text"
                  href="https://jlab.bluejeans.com">BlueJeans site</a>
                first to gain access (use your JLab credentials).
              </p>
              <h3><span class="mw-headline"
                  id="Review_of_minutes_from_the_last_meeting">Review of
                  minutes from the last meeting</span></h3>
              <p>We went over the <a
href="https://halldweb.jlab.org/wiki/index.php/GlueX_TOF_Meeting,_January_13,_2021#Minutes"
                  title="GlueX TOF Meeting, January 13, 2021">minutes
                  from January 13</a> without significant comment.
              </p>
              <h3><span class="mw-headline" id="PMT_Repair">PMT Repair</span></h3>
              <ul>
                <li> Prompted by Sasha's question at the last meeting,
                  Beni checked on the HV settings of the tubes that are
                  candidates for replacement. He found that they are all
                  on the low side, 1210 to 1290 V. Based on that, he
                  thinks that we should replace only two of the PMTs
                  (PMTs 69 and 113) rather than the five he identified
                  last time.</li>
                <li> Sasha reminded us that all of the single-ended,
                  new-in-TOF-II modules have the end surface near the
                  beam hole blackened.</li>
                <li> Sasha told us that Paul Eugenio is willing to come
                  up to the Lab to do the replacement, but the required
                  two-week quarantine makes that impractical.</li>
                <li> The tubes will be replaced in situ (no need to
                  remove the entire array from the forward carriage).</li>
                <li> Beni proposed practicing PMT replacement on one of
                  the unused modules in the Hall.</li>
                <li> Mark suggested that as we learn how to do the
                  replacement, we also train a member of the technical
                  staff on the task.</li>
              </ul>
              <h3><span class="mw-headline" id="TOF_II_Trigger">TOF II
                  Trigger</span></h3>
              <p>Beni ran down the activity in progress on standing up a
                trigger with TOF II.
              </p>
              <ul>
                <li> We want to present progress at the CPP/NPP
                  readiness review.</li>
                <li> Hai Dong told Beni that all changes necessary to
                  support the TOF II geometry can be done in the crate
                  trigger processor (CTP). Nothing upstream of the CTP
                  need be modified.</li>
                <li> Hai has written up a work plan. Elton presented it
                  at the CPP meeting this morning.
                  <ul>
                    <li> The work will take 4 weeks.</li>
                    <li> 2 to 3 weeks will be needed for bench testing.</li>
                    <li> Sascha Somov will have to test the system in
                      the Hall after that, either with cosmics or (most
                      likely) with beam.</li>
                  </ul>
                </li>
                <li> The plan puts us on track for having the system
                  ready for beam tests before the August run.</li>
                <li> Beni and Mark will meet to confirm channel
                  assignments as transmitted to Hai. Mark has the map
                  that was used to create translation tables that have
                  worked in recent data taking.</li>
              </ul>
              <h3><span class="mw-headline" id="TOF_NIM_paper">TOF NIM
                  paper</span></h3>
              <p>No known progress.
              </p>
              <h3><span class="mw-headline" id="Action_Item_Recap">Action
                  Item Recap</span></h3>
              <ol>
                <li> Decide on when to ship PMTs to JLab from FSU (Mark,
                  Paul Eugenio)</li>
                <li> Prepare a complete draft of the TOF NIM paper.
                  (all)</li>
                <li> Make a plan for TOF repair during the SAD,
                  including Paul in the discussion. (all)</li>
                <li> Renew the equipment loan agreement between JLab and
                  FSU (Mark, Paul)</li>
              </ol>