[Halld-tagger] Tagger hall plans
Fernando J Barbosa
barbosa at jlab.org
Thu Aug 21 14:52:19 EDT 2014
Hi Alex,
That requires 45 coax cables, 1 twisted-pair cable and the splitter box.
I don't believe we have that many spare coax cables but we can use the
non-fire rated coax cables from the old FCAL for tests in the ESB. So,
no problem.
Best regards,
Fernando
On 8/21/2014 12:31 PM, Alexander Somov wrote:
> Hi Fernando,
>
> Do we have spare cables to connect 15 channels ?
> (F1TDC, fadc, and LE DSC can be placed in the same crate)
>
> Thanks,
> Alex
>
>
>
> On Thu, 21 Aug 2014, Richard Jones wrote:
>
>> In his last message, Alex Somov wrote:
>>
>> Richard should return the VXS crate, which we can install into the
>> existing
>> rack in the ESB.
>>
>> Will do. Can you provide us with enough lemo cables and a splitter to
>> connect 15 outputs at a time to the crate, and read out both the fadc
>> and
>> tdc at the same time?
>>
>> -Richard J.
>>
>>
>> On Thu, Aug 21, 2014 at 11:08 AM, Alexander Somov <somov at jlab.org>
>> wrote:
>>
>>>
>>> Hi Fernando,
>>>
>>> I tink that testing of TAGM should be done in the ESB. If the
>>> detector components are here in the beginning of September,
>>> it would take at least a week or two to assemble the TAGM. We
>>> may consider to move the detector to the Hall just to check that
>>> evrt fits and bring it back to the ESB.
>>>
>>> Richard should return the VXS crate, which we can install into
>>> the existing rack in the ESB. We'll need a control Wiener crate
>>> and some spare cables to read out one or two fadcs.
>>>
>>> Cheers,
>>> Alex
>>>
>>>
>>>
>>>
>>>
>>>
>>>
>>> On Thu, 21 Aug 2014, Richard Jones wrote:
>>>
>>> Fernando,
>>>>
>>>> I am going to propose that we set things up in the ESB area when we
>>>> arrive,
>>>> and do what setup and testing we can there prior to the move-in
>>>> date in
>>>> the
>>>> first week of October or thereabouts. Any objections?
>>>>
>>>> -Richard Jones
>>>>
>>>>
>>>> On Thu, Aug 21, 2014 at 10:03 AM, Fernando J Barbosa
>>>> <barbosa at jlab.org>
>>>> wrote:
>>>>
>>>> Hi Richard, Alex,
>>>>>
>>>>> We will start removing the electronics from the tagger hall on 22
>>>>> Sept
>>>>> 2014 in preparation for beam on 29 Sept 2014. All the cables will be
>>>>> disconnected from the modules but remain in place with the
>>>>> mini-racks; we
>>>>> then remove the crates/chassis with the modules and move them to a
>>>>> safe
>>>>> place, probably the ESB.
>>>>>
>>>>> You have indicated that you will be bringing the TAGM to JLab
>>>>> during the
>>>>> week of 9/1. In view of this, you only have two weeks (weeks of
>>>>> 9/8 and
>>>>> 9/15) to install, connect and test the TAGM. Is this enough time
>>>>> to do
>>>>> any
>>>>> significant work (setup software, controls, readout, etc)? Or
>>>>> should we
>>>>> plan to work in the ESB, which allows limited testing (limited
>>>>> number of
>>>>> cables, no 208V for the crates so power is an issue anywhere
>>>>> outside of
>>>>> the
>>>>> tagger hall)?
>>>>>
>>>>> Please work out a viable plan and let me know ASAP. If we are not
>>>>> going
>>>>> to
>>>>> do anything in the tagger hall, we could go ahead and start
>>>>> removing the
>>>>> electronics earlier so we are not rushing later.
>>>>>
>>>>> Best regards,
>>>>> Fernando
>>>>>
>>>>>
>>>>
>>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: barbosa.vcf
Type: text/x-vcard
Size: 265 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/halld-tagger/attachments/20140821/3c33030e/attachment.vcf
More information about the Halld-tagger
mailing list