[Halld-tagger] Fwd: [New Logentry] To-do list for photon beam working group in Spring 2015 run

Richard Jones richard.t.jones at uconn.edu
Wed Apr 1 18:12:59 EDT 2015


   To-do list for photon beam working group in Spring 2015 run
<https://logbooks.jlab.org/entry/3331498>

Lognumber 3331498 <https://logbooks.jlab.org/entry/3331498>. Submitted by
jonesrt <https://logbooks.jlab.org/user/jonesrt> on Wed, 04/01/2015 - 18:01.

Logbooks: HDLOG <https://logbooks.jlab.org/book/hdlog>Tags: Beamline
<https://logbooks.jlab.org/tag/beamline>
 Here is a short summary of the useful things that we would like to do
during this run if and when we get beam. It is a short list for a short
run. I can break it out into more pieces and add more details if desired.

   1. Collect an order of magnitude more statistics with the PS trigger
   than we did in Fall 2014. At present, this means that we cannot be taking
   main detector triggers at the same time. Perhaps moving Alex Somov's
   trigger studies upstream of this may allow him to introduce a new
   capability to run the two triggers simultaneously. Under optimal beam
   conditions at 5.5 GeV, with the radiator thickness and beam current
   adjusted to give a PS trigger rate of 600 Hz we estimate that our goal for
   this item would be reached in 6 hours of beam.
   2. Vbias scans of the tagger microscope. For this, we do not need
   dedicated triggers, but any beam with a radiator in would do. This would be
   good to do during a period of trigger studies or something like that where
   having the microscope partially disabled would not interfere with the
   program goals. Each scan should take about 30 minutes of beam, and we would
   like to request 3 such periods initially. Given that it is only 30 minutes,
   it might be reasonable to request the option of coming back again once
   these data have been analyzed for one or two more scans near the end of the
   run.
   3. Engineering run with diamond radiators. Ken Livingston has requested
   3 shifts for initial setup and alignment, which probably should not be
   back-to-back. Once the diamond is aligned, we would like to take data with
   the PS trigger. Taking these data during a period with stable beam will be
   a priority. A total of 10M triggers with the diamond radiator and the PS
   trigger would be the request. These could substitute for the 10M triggers
   in item 1, so if all goes well we could get substantial overlap between
   item 3 and 1.

Richard Jones
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halld-tagger/attachments/20150401/ee750d15/attachment.html 


More information about the Halld-tagger mailing list