    Hi,<br>
    <br>
    Our thinking from way back is to avoid running signals to the
    counting house.&nbsp; Instead we would connect internet-controllable
    scopes to the signals and view the output in the counting house.<br>
    <br>
    Also, the lab prefers to use internet cameras instead of video.&nbsp;
    With these we can place a camera anywhere there is ethernet access,
    which is everywhere.<br>
    <br>
    Fernando can comment on potential grounding problems associated with
    running copper from e.g. the collimator cave to the counting house.&nbsp;
    The baseline DAQ doesn't include a DAQ crate in the collimator cave,
    I assume Richard refers to a monitoring crate.&nbsp; If such monitoring
    is needed we can discuss how we might do this.<br>
    <br>
    <br>
    <br>
    <br>
    On 11/06/2012 12:59 PM, Fernando J Barbosa wrote:
    <blockquote cite="mid:50995011.6070209@jlab.org" type="cite">
      <meta content="text/html; charset=ISO-8859-1"
        http-equiv="Content-Type">
      Hi Richard,<br>
      <br>
      This seems to be a question for controls . The original plan was
      to have just fibers going to the counting house, no coax cables
      (maybe just a few now).<br>
      <br>
      Best regards,<br>
      Fernando<br>
      <br>
      <br>
      On 11/6/2012 11:51 AM, Richard Jones wrote:
      <blockquote cite="mid:50994016.9000408@uconn.edu" type="cite">
        <div class="moz-cite-prefix">Hi Fernando,<br>
          <br>
          The cabling plans that I have seen have focused on detector
          subsystems.&nbsp; I don't think we have established plans yet for
          beamline related sensors that are not a part of the data
          acquisition.&nbsp; Examples of this would be coax cables for video
          cameras looking at the radiator target, and background rate
          monitor scintillators that we will want placed at various
          locations along the beamline.&nbsp; How many of these and where
          they will be placed is not fixed yet, but it will be very
          useful to have patch panels with connections to the counting
          house so we can look at various things when beam is in the
          hall.&nbsp; The same thing goes for the collimator cave.&nbsp;
          Especially during commissioning it will be useful to have
          measurements of background in the cave, and know how things
          are changing with beam tune, etc.<br>
          <br>
          When I was thinking about these things, it struck me that it
          would be useful to also be able to view the currents from the
          active collimator directly in the counting house, and do the
          signal digitization there.&nbsp; This way we do not have to put a
          data acquisition crate in the high-radiation area of the
          collimator cave and risk it rebooting, etc.&nbsp; Especially during
          commissioning this would seem to be useful.<br>
          <br>
          -Richard J.<br>
          <br>
          On 11/6/2012 10:14 AM, Fernando J Barbosa wrote:<br>
        </div>
        <blockquote cite="mid:50992969.7060002@jlab.org" type="cite"> Hi
          Richard,<br>
          <br>
          I have been talking about cables and such for years and you
          never requested these. Are these anywhere on the plans? Any
          details?<br>
          <br>
          Best regards,<br>
          Fernando<br>
          <br>
          On 11/6/2012 9:08 AM, Richard Jones wrote:
          <blockquote cite="mid:509919F0.8050903@uconn.edu" type="cite">
            Hi Fernando,<br>
            <br>
            I don't know where this request should be routed, so I am
            sending it directly to you.&nbsp; I would like to make sure that
            we have coaxial connections from the upstream wall of the
            collimator cave to the counting house.&nbsp; Here are some
            signals that we would like to be able to read directly, and
            minimize how much DAq electronics we need to place in a hot
            radiation area.<br>
            <ol>
              <li>output signals from the active collimator: 8</li>
              <li>cave background rate monitor scintillators: 2-4</li>
            </ol>
            <p>A panel of 16 or 24 would be sufficient, I believe.&nbsp;
              There are also controls for the collimator translation
              stage and associated limit switches.&nbsp; Further downstream
              there is the converter target ladder, which may be inside
              the cave or outside, depending on the ability to shield
              the stray magnetic field from the pair spectrometer.&nbsp; I
              just want to make sure we have cables and cable trays for
              these interconnects, as it may be difficult to add them
              later.<br>
            </p>
            <p>-Richard Jones<br>
            </p>
          </blockquote>
          <br>
        </blockquote>
        <br>
      </blockquote>
      <br>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Halld-tagger mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Halld-tagger@jlab.org">Halld-tagger@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/halld-tagger">https://mailman.jlab.org/mailman/listinfo/halld-tagger</a></pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 

                                Sincerely,
                                        Elliott
 

================================================================================


 Those raised in a morally relative or neutral environment will hold
                    no truths to be self-evident.
                                   

Elliott Wolin
Staff Physicist, Jefferson Lab