<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto"><div>Hi Dan,</div><div><br></div><div>I have the survey group looking through their fiducialization data closely again.</div><div><br></div><div>Tim<br><br>Sent from my iPhone</div><div><br>On Feb 6, 2014, at 7:26 PM, Daniel Sober &lt;<a href="mailto:sober@cua.edu">sober@cua.edu</a>&gt; wrote:<br><br></div><blockquote type="cite"><div>
  

    
  
  
    I have added some new plots for Configuration 6 (the entry beam
    pipe) and Configuration 3 to the web page<br>
    <a href="http://faculty.cua.edu/sober/halld/mapping/">http://faculty.cua.edu/sober/halld/mapping/</a><br>
    <br>
    The Config. 3 plots vs X look a little choppy, but I have not yet
    applied the probe calibrations (which are all in the right
    directions).<br>
    <br>
    The data points in the entry region align pretty well with the
    nominal beam line (a few mm, 7 mr), but there is a disturbing
    longitudinal offset of about 4 mm with respect to the Tosca field
    (although the field shapes agree very well.)&nbsp; How convinced are you
    about the reliability of the surveys? <br>
    <br>
    Dan<br>
    <br>
    <br>
    <div class="moz-signature">-- <br>
      <font color="#ff0000"><i>Daniel Sober<br>
          Professor<br>
          Physics Department<br>
          The Catholic University of America<br>
          Washington, DC 20064<br>
          Phone: (202) 319-5856, -5315<br>
          E-mail: <a href="mailto:sober@cua.edu">sober@cua.edu</a></i></font><br>
    </div>
  

</div></blockquote><blockquote type="cite"><div><span>_______________________________________________</span><br><span>Halld-tagger mailing list</span><br><span><a href="mailto:Halld-tagger@jlab.org">Halld-tagger@jlab.org</a></span><br><span><a href="https://mailman.jlab.org/mailman/listinfo/halld-tagger">https://mailman.jlab.org/mailman/listinfo/halld-tagger</a></span></div></blockquote></body></html>