<div dir="ltr">In his last message, Alex Somov wrote:<div><br></div><div><font color="#cc0000" style="background-color:rgb(255,255,255)"><span style="font-family:arial,sans-serif;font-size:13px">Richard should return the VXS crate, which we can install into </span><span style="font-family:arial,sans-serif;font-size:13px">the existing rack in the ESB. </span></font><br>
</div><div><font color="#cc0000" style="background-color:rgb(255,255,255)"><span style="font-family:arial,sans-serif;font-size:13px"><br></span></font></div><div><font style="background-color:rgb(255,255,255)" color="#000000"><span style="font-family:arial,sans-serif;font-size:13px">Will do. Can you provide us with enough lemo cables and a splitter to connect 15 outputs at a time to the crate, and read out both the fadc and tdc at the same time?</span></font></div>
<div><font style="background-color:rgb(255,255,255)" color="#000000"><span style="font-family:arial,sans-serif;font-size:13px"><br></span></font></div><div><font style="background-color:rgb(255,255,255)" color="#000000"><span style="font-family:arial,sans-serif;font-size:13px">-Richard J.</span></font></div>
</div><div class="gmail_extra"><br><br><div class="gmail_quote">On Thu, Aug 21, 2014 at 11:08 AM, Alexander Somov <span dir="ltr"><<a href="mailto:somov@jlab.org" target="_blank">somov@jlab.org</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><br>
Hi Fernando,<br>
<br>
I tink that testing of TAGM should be done in the ESB. If the<br>
detector components are here in the beginning of September,<br>
it would take at least a week or two to assemble the TAGM. We<br>
may consider to move the detector to the Hall just to check that<br>
evrt fits and bring it back to the ESB.<br>
<br>
Richard should return the VXS crate, which we can install into<br>
the existing rack in the ESB. We'll need a control Wiener crate<br>
and some spare cables to read out one or two fadcs.<br>
<br>
Cheers,<br>
Alex<div class="HOEnZb"><div class="h5"><br>
<br>
<br>
<br>
<br>
<br>
<br>
On Thu, 21 Aug 2014, Richard Jones wrote:<br>
<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
Fernando,<br>
<br>
I am going to propose that we set things up in the ESB area when we arrive,<br>
and do what setup and testing we can there prior to the move-in date in the<br>
first week of October or thereabouts. Any objections?<br>
<br>
-Richard Jones<br>
<br>
<br>
On Thu, Aug 21, 2014 at 10:03 AM, Fernando J Barbosa <<a href="mailto:barbosa@jlab.org" target="_blank">barbosa@jlab.org</a>><br>
wrote:<br>
<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
Hi Richard, Alex,<br>
<br>
We will start removing the electronics from the tagger hall on 22 Sept<br>
2014 in preparation for beam on 29 Sept 2014. All the cables will be<br>
disconnected from the modules but remain in place with the mini-racks; we<br>
then remove the crates/chassis with the modules and move them to a safe<br>
place, probably the ESB.<br>
<br>
You have indicated that you will be bringing the TAGM to JLab during the<br>
week of 9/1. In view of this, you only have two weeks (weeks of 9/8 and<br>
9/15) to install, connect and test the TAGM. Is this enough time to do any<br>
significant work (setup software, controls, readout, etc)? Or should we<br>
plan to work in the ESB, which allows limited testing (limited number of<br>
cables, no 208V for the crates so power is an issue anywhere outside of the<br>
tagger hall)?<br>
<br>
Please work out a viable plan and let me know ASAP. If we are not going to<br>
do anything in the tagger hall, we could go ahead and start removing the<br>
electronics earlier so we are not rushing later.<br>
<br>
Best regards,<br>
Fernando<br>