The next FDC group meeting will take place tomorrow in F326. The
meeting will start at 1:15 p.m. tomorrow due to a 2:00 p.m. conflict.
***PLEASE NOTE THE NON-STANDARD STARTING TIME FOR TOMORROW***. The
meeting agenda is given below.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
August 27, 2009
-----------------------------
1. Full-scale prototype preparations
- update on gas window construction
- stack construction
- status of assembly jig
- assembly document status
2. Wire frame update
- update on current problems
- additional cleaning needed?
- update of construction document
- wire electroplating procedures
- Phase 3 planning
- dealing with flatness issues
- design of combs
- new strongback design
- other facility modifications
- final circuit board design
- time table for construction
- board cleaning
3. Cathode frame update
- cathode construction updates
- frame modifications
- end cathodes/ground planes
- gluing cathodes to wire frames
- cathode flatness measurement status
- rigid-flex assembly QA update
- rigid-flex assembly attachment
- test soldering
- PR for 2-um board material for production
- cathode board trace movement discussion/work
- cathode construction document status
- document for QA/soldering/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
- cooling system test report
- sense and field wire test document
- remaining FDC system design work
5. Prototype tests
- update on cosmic ray stand
- noise issues in EEL126
- small-scale prototype resolution study update
- test plan for full-scale prototype
- fixture for support/rotation of full-scale prototype
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman at jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************
More information about the Halld-tracking-hw
mailing list