[Halld-tracking-hw] Next FDC group meeting
Daniel S. Carman
carman at jlab.org
Wed Nov 18 10:13:11 EST 2009
Folks,
The next FDC group meeting is scheduled for tomorrow at 1:00 p.m. in
F326. Note the non-standard start time!! The agenda is given below.
Regards,
Daniel
**********************************************************************
FDC Weekly Meeting Agenda
November 19, 2009
-----------------------------
1. Single layer studies
- status update
- results and findings
- horizontal vs. vertical orientations
- wire diameter issue
2. Full-scale prototype preparations
- gas sealing issues
- stack construction
- layer 2
- layer 3
- assembly document status
3. Wire frame update
- QA checkout of wire frames
- Phase 3 planning
- timeline
- dealing with flatness issues
- design of combs
- new strongback design
- other facility modifications
- final circuit board design
- time table for construction
- board cleaning
- Note/question from IUCF
4. Cathode frame update
- rigid-flex QA update
- rigid-flex soldering status
- document for QA/stuffing/cleaning cathode daughter boards
5. Miscellaneous
- cooling system test report
- sense and field wire test document
- remaining FDC system design work
- CDC/FDC wire measurements
- single piece circuit board?
6. Prototype tests
- small-scale prototype resolution study update
- test plan for full-scale prototype
***********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman at jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************
More information about the Halld-tracking-hw
mailing list