FDC Weekly Meeting Agenda
September 24, 2009
-----------------------------
1. Full-scale prototype preparations
     - stack construction
        - assembly document status
        - start of stack assembly
        - single layer voltage tests
        - problems with o-rings
        - modifications to o-ring design
     - indium solder order status
     - manpower issues
2. Wire frame update
     - update on wire frame preparations (P1,P3,P4)
        - humidity sealing
        - test configuration for P3
        - work plans for P4
     - milled pocket for rigid-flex clearance
     - update of construction document
        - wire electroplating procedures
     - Phase 3 planning
        - dealing with flatness issues
        - design of combs
        - new strongback design
        - other facility modifications
        - final circuit board design
        - time table for construction
        - board cleaning
3. Cathode frame update
     - cathode construction updates
        - gluing cathodes to wire frames
     - rigid-flex assembly QA update
     - rigid-flex assembly attachment
        - test soldering
        - time line for ``real" soldering
     - PR for 2-um board material for production
     - cathode construction document status
     - document for QA/soldering/cleaning cathodes
     - document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
     - cooling system test report
     - sense and field wire test document
     - remaining FDC system design work
5. Prototype tests
     - update on cosmic ray stand
     - noise issues in EEL126
     - small-scale prototype resolution study update
     - test plan for full-scale prototype
     - fixture for support/rotation of full-scale prototype
**********************************************************************
**********************************************************************
*                                                                    *
* Dr. Daniel S. Carman                   e-mail : carman at jlab.org    *
* Staff Scientist                        office : (757)-269-5586     *
* Jefferson Laboratory                   web: www.jlab.org/~carman   *
*                                                                    *
**********************************************************************



More information about the Halld-tracking-hw mailing list