FDC Weekly Meeting Agenda
October 1, 2009
-----------------------------
1. Full-scale prototype preparations
- stack construction
- assembly document status
- start of stack assembly
- single layer voltage tests
- o-ring studies
- modifications to o-ring design
- indium solder order status
- manpower update
2. Wire frame update
- update on wire frame preparations (P1,P3,P4)
- milled pocket for rigid-flex clearance
- Phase 3 planning
- dealing with flatness issues
- design of combs
- new strongback design
- other facility modifications
- final circuit board design
- time table for construction
- board cleaning
3. Cathode frame update
- laminating cathodes to wire frames
- rigid-flex assembly QA update
- rigid-flex assembly attachment
- test soldering
- time line for ``real" soldering
- PR for 2-um board material for production
- document for QA/soldering/cleaning cathodes
- document for QA/stuffing/cleaning cathode daughter boards
4. Miscellaneous
- cooling system test report
- sense and field wire test document
- remaining FDC system design work
5. Prototype tests
- update on cosmic ray stand
- small-scale prototype resolution study update
- test plan for full-scale prototype
**********************************************************************
**********************************************************************
* *
* Dr. Daniel S. Carman e-mail : carman at jlab.org *
* Staff Scientist office : (757)-269-5586 *
* Jefferson Laboratory web: www.jlab.org/~carman *
* *
**********************************************************************
More information about the Halld-tracking-hw
mailing list