[Halld-tracking-hw] [GlueX] Hall D cables

Yves Van Haarlem yvhaarle at ernest.phys.cmu.edu
Thu Mar 25 11:52:42 EDT 2010


Hi Fernando,

Here is our feedback on the proposed cabling:

- The HV configuration looks fine

- Signal cables: we think 146 Amphenol cables are not enough, you can 
check with Slava how many HV-boards the CDC needs but we are pretty sure 
it is more than 150 and it is good to have some spares.

- What about cables for pre-amp test signals? As the LV cabling still has 
to come and LV + test signals end in a single connector on the 
HV board, we assume test signals will be done together with the LV.

Cheers,
 	Yves



                           /--------------------------------
                          /   Yves Van Haarlem
        _--~~--_         /
      /~/_|  |_\~\      /      Carnegie Mellon University
     |____________|    /        Department of Physics
     |[][][][][][]|:= /          Wean Hall room 8404
   __| __         |__ \       	 Pittsburgh, PA 15213
  |  ||. |   ==   |  | \           USA
(|  ||__|   ==   |  |) \
  |  |[] []  ==   |  |   \   	    Tel.:   +1 412 268-6949
  |  |____________|  |    \                  +1 412 641-9252
  /__\            /__\     \	      Fax.: +1 412 681-0648
   ~~              ~~       \-----------------------------------

On Sat, 13 Mar 2010, Fernando J. Barbosa wrote:

> Hello everyone,
>
> I have attached a pdf with a list of signal and HV cables for use in Hall D. 
> This list will be later expanded to include the LV and optical fiber cables 
> and it will form the basis of a formal specifications document. The cables 
> listed connect the various detector sub-systems to instrument racks.
>
> The cable lengths, with routing allowances for trays and racks, have been 
> checked with the Hall D mechanical group; the suggested actual length of the 
> cables have been rounded up to allow grouping among different sub-systems and 
> minimize cost and part numbers. The nominal cable rating is NEC UL CL2 and 
> cable part numbers are suggested.
>
> The types of connectors (no actual part numbers at this time) are included 
> for the source and destination (the readout modules use Lemo-style 
> connectors).
>
> Due to accelerated procurement initiatives by the 12GeV management team, I am 
> requesting the following information and feedback, where appropriate, by the 
> end of next week (3/19/2010) from the collaboration and from the various 
> detector subsystems:
>
> 1. Cable type & ratings (with anticipated HV operation levels of PMTs, for 
> example)
> 2. Length
> 3. Connector types (source and destination)
>
> My plan is as follows:
>
> 1. Request info/feedback from collaboration (this)
> 2. Finalize specifications document
> 3. Submit formal specifications document to Dianne (12GeV Integration) for 
> submission to the JLab Electrical Safety Committee and approval
> 4. Outline procurement plan with the JLab procurement dept.
> 5. Procure cable assemblies from vendors.
>
> I note that some detectors are not completely defined for the final 
> configuration in the hall but the number of cables from these detectors is 
> relatively small. I would appreciate if you could provide information as to 
> the procurement readiness for such sub-systems.
>
> Thanks for your prompt feedback in advance.
>
> Best regards,
> Fernando
>


More information about the Halld-tracking-hw mailing list