[Halld-tracking-hw] [GlueX] Hall D cables
Yves Van Haarlem
yvhaarle at ernest.phys.cmu.edu
Thu Mar 25 13:36:24 EDT 2010
Hi Fernando,
>> - What about cables for pre-amp test signals? As the LV cabling still has
>> to come and LV + test signals end in a single connector on the HV board, we
>> assume test signals will be done together with the LV.
> The Amphenol cable has 25 pairs and one pair is used for the test signal
> which is generated on the fADC125.
I am confused: the signal coming from the preamp is differential. so I
thought you need 24 pairs for the signals + at least 1 single lead
(probably one pair) for ground, so there is no room for the test signal?
Or what is the grounding scheme?
Cheers,
Yves
>
> Thanks for the feedback.
>
> Best regards,
> Fernando
>
>
>
>
>>
>> Cheers,
>> Yves
>>
>>
>>
>> /--------------------------------
>> / Yves Van Haarlem
>> _--~~--_ /
>> /~/_| |_\~\ / Carnegie Mellon University
>> |____________| / Department of Physics
>> |[][][][][][]|:= / Wean Hall room 8404
>> __| __ |__ \ Pittsburgh, PA 15213
>> | ||. | == | | \ USA
>> (| ||__| == | |) \
>> | |[] [] == | | \ Tel.: +1 412 268-6949
>> | |____________| | \ +1 412 641-9252
>> /__\ /__\ \ Fax.: +1 412 681-0648
>> ~~ ~~ \-----------------------------------
>>
>> On Sat, 13 Mar 2010, Fernando J. Barbosa wrote:
>>
>>> Hello everyone,
>>>
>>> I have attached a pdf with a list of signal and HV cables for use in Hall
>>> D. This list will be later expanded to include the LV and optical fiber
>>> cables and it will form the basis of a formal specifications document. The
>>> cables listed connect the various detector sub-systems to instrument
>>> racks.
>>>
>>> The cable lengths, with routing allowances for trays and racks, have been
>>> checked with the Hall D mechanical group; the suggested actual length of
>>> the cables have been rounded up to allow grouping among different
>>> sub-systems and minimize cost and part numbers. The nominal cable rating
>>> is NEC UL CL2 and cable part numbers are suggested.
>>>
>>> The types of connectors (no actual part numbers at this time) are included
>>> for the source and destination (the readout modules use Lemo-style
>>> connectors).
>>>
>>> Due to accelerated procurement initiatives by the 12GeV management team, I
>>> am requesting the following information and feedback, where appropriate,
>>> by the end of next week (3/19/2010) from the collaboration and from the
>>> various detector subsystems:
>>>
>>> 1. Cable type & ratings (with anticipated HV operation levels of PMTs, for
>>> example)
>>> 2. Length
>>> 3. Connector types (source and destination)
>>>
>>> My plan is as follows:
>>>
>>> 1. Request info/feedback from collaboration (this)
>>> 2. Finalize specifications document
>>> 3. Submit formal specifications document to Dianne (12GeV Integration) for
>>> submission to the JLab Electrical Safety Committee and approval
>>> 4. Outline procurement plan with the JLab procurement dept.
>>> 5. Procure cable assemblies from vendors.
>>>
>>> I note that some detectors are not completely defined for the final
>>> configuration in the hall but the number of cables from these detectors is
>>> relatively small. I would appreciate if you could provide information as
>>> to the procurement readiness for such sub-systems.
>>>
>>> Thanks for your prompt feedback in advance.
>>>
>>> Best regards,
>>> Fernando
>>>
>