<html><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; "><div><br></div><div>Minutes are online at&nbsp;<a href="https://halldweb1.jlab.org/wiki/index.php/January_16,_2013_Tracking_CDC/FDC">https://halldweb1.jlab.org/wiki/index.php/January_16,_2013_Tracking_CDC/FDC</a></div><div><br></div><div>Text below</div><div><br></div><div><p>Present: Curtis, Naomi, Beni, Simon, Lubomir, Eugene, Mark
</p>
<ol><li> Collaboration meeting
<ol><li> 3 talks have been reserved for tracking 
</li></ol>
</li><li> FDC Update
<ol><li> Last production package (#2) assembled. Gas pressure lower by 
10-20% than in the other packages at the same flow, could be due to the 
new manifolds since no gas leak was found.
</li><li> Package #4 is being tested at JLab. It held the nominal HV 
right from the beginning without any trips. Beni: all the wires and 
strips already tested and working fine except 4 strip channels showing 
somewhat lower signals.
</li><li> Decided to build 6 spare cells. Will chose 6 wire frames out 
of 7 with some of them showing elevated dark current. We have also the 
material for 12 cathodes. 
</li></ol>
</li><li> CDC Update
<ol><li> CDC construction has been stalled pending the arrival of the 
transfer ring (STOP PRESS the shipment of this was authorized this 
afternoon - wahoo!)
</li><li> Naomi measured pedestal widths of the HVB &amp; preamp 
combinations inside a grounded metal box and found that the pedestal 
width of the original HVB and preamp4 was only 2 fADC units, after 
altering the HVB to attenuate the input charge to the preamp and later 
removing the preamp's terminating resistors to match its range to that 
of the fADC we now have a pedestal width of 15 fADC units, before adding
 any pickup from the chamber (pickup from the prototype now adds only 
1-2 fADC units). The increased pedestal width was not so obvious at the 
time because the noise from the prototype was dominated by pickup from 
the thermocouples (since removed). 
</li><li> Eugene requires an estimate of CDC completion date and costs 
to completion.  CMU's contract needs to be extended to allow the CDC to 
be tested at CMU until Hall D is ready to receive it (probably in 
August). Testing was included in the original contract but the original 
delivery point is April.
</li></ol>