[Halld] Hall D Equipment alignment spreadsheet for Fall2017/Spring2018

Timothy Whitlatch whitey at jlab.org
Fri Jan 12 13:20:21 EST 2018


Hi All, 

The updated spreadsheet and survey documents can be found on the "O" drive at O:\halld_engineering\Alignment\Fall 2017 Run 

Some notes below: 
Items resurveyed prior to Fall 2017 run: HG Pair Spec, TAC, Muon Detector (added), Collimator, Goniometer, FCAL, Target/SC 


TOF was not remeasured but the originally measured offset from th FCAL was assumed since it was not disturbed. 
CompCal was removed for this run 
Scattering chamber was not remeasured 
10micron foil on Goni replaced with 40micron al foil and V wire installed 


Muon detector was originally measured to be 28mm beam right 
and 22mm low. It was re-positioned to nominal but not remeasured. 
Cheers, 

Tim Whitlatch 
Hall D Engineer 
Jefferson Lab 
600 KELVIN DR STE 5 
Newport News, VA 23606-4468 
757-269-5087 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld/attachments/20180112/e6b1b9db/attachment.html>


More information about the Halld mailing list