[Halld] [New Logentry] RC summary for Fri May 9, 8AM to Sat May 10, 8AM

bgrube at jlab.org bgrube at jlab.org
Sat May 10 14:20:02 EDT 2025


Logentry Text:
--
After successfully fixing the stuck motor for the amorphous radiator and the broken ADC card in the CDC we got beam back at about 12:30.

We spent 6h to improve the convergence of the beam, performing in total 8 harp scans.

After a raw mode-run with AMO radiator, production data taking resumed at about 19:45. Unfortunately the beam lasted only up to about 2:30 in the night. During this time we collected 156M events for AMO and 294M events for PARA 0/90 deg. 

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4372794