<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"><!-- P {margin-top:0;margin-bottom:0;} --></style>
</head>
<body dir="ltr">
<div id="divtagdefaultwrapper" style="font-size:12pt;color:#000000;font-family:Calibri,Helvetica,sans-serif;" dir="ltr">
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">Hi all,</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">Beni Zihlmann will coordinate the required operations from the Hall D side.</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">Eugene<br>
</p>
<br>
<div style="color: rgb(0, 0, 0);">
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font style="font-size:11pt" face="Calibri, sans-serif" color="#000000"><b>From:</b> Rolf Ent<br>
<b>Sent:</b> Tuesday, April 23, 2019 10:54 AM<br>
<b>To:</b> Stephen Wood; Cynthia (Thia) Keppel; Eugene Chudakov; Drew Weisenberger<br>
<b>Cc:</b> Joe Beaufait; Walt Akers; Patrizia Rossi; Javier Gomez<br>
<b>Subject:</b> (some of) EEL-126 to be emptied</font>
<div> </div>
</div>
<div dir="ltr">
<div id="x_divtagdefaultwrapper" dir="ltr" style="font-size:12pt; color:#000000; font-family:Calibri,Helvetica,sans-serif">
<p style="margin-top:0; margin-bottom:0">Dear Steve, Thia, Eugene, Drew,</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">in an effort to (finally) clean up EEL-126 a bit with Facilities, BEFORE the summer students</p>
<p style="margin-top:0; margin-bottom:0">arrive, we want the "central area" of EEL-126 emptied out. The plan is as follows:</p>
<p style="margin-top:0; margin-bottom:0">1) have some of your staff go into the central area of EEL-126 (i.e., not the area where</p>
<p style="margin-top:0; margin-bottom:0">    the calorimeter blocks are) and mark what needs to be kept</p>
<p style="margin-top:0; margin-bottom:0">2) everything else will be thrashed end of next week</p>
<p style="margin-top:0; margin-bottom:0">3) after May 3rd, we start emptying out that area of EEL-126</p>
<p style="margin-top:0; margin-bottom:0">4) Facilities will then remove the chemical cabinet/exhaust, and do the floor and have</p>
<p style="margin-top:0; margin-bottom:0">     the walls painted</p>
<p style="margin-top:0; margin-bottom:0">5) Walt will make a floor plan with multiple locked cabinets and works spaces along the</p>
<p style="margin-top:0; margin-bottom:0">    walls, with central areas for larger projects.</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Then, before the end of May we will have a workable space for the Summer period.</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Don't make it too difficult on yourself, but it would be great if you could have the</p>
<p style="margin-top:0; margin-bottom:0">relevant staff who owns items in the central area of EEL-126 walk around with Walt</p>
<p style="margin-top:0; margin-bottom:0">and mark what needs to be kept. This should not take much of people's time. And</p>
<p style="margin-top:0; margin-bottom:0">whatever is not marked/the rest will go.</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Best regards,   Rolf<br>
</p>
</div>
</div>
</div>
</div>
</body>
</html>