<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
Hi all,</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
<br>
</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
There is a possibility to get beam in Hall D on March 11-14, 2023. It is marked as TBD in the new schedule.
<br>
</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
<br>
</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
This is the only window for us till Sept 2024, since the 750MHz separator is not operational during this run and Hall D can only get beam when fewer than 3 other halls are running and no one runs at 5 passes.</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
<br>
</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
We need to discuss possible tasks to be done during such a short period. I would expect 2 days spent for beam tuning and other overhead, and 2 days of useful activities. Perhaps, we should use an Al radiator and a relatively low current to avoid BLM trips and
 shorten the ion chambers' calibration. One can think of:</div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);" class="elementToProof">
<ul data-editing-info="{"orderedStyleType":1,"unorderedStyleType":1}">
<li style="list-style-type: disc;">Detector testing in PS</li><li style="list-style-type: disc;">Testing something with the main spectrometer. Due a limited supply of Helium at this moment in the Lab we need to inform soon the Cryo group whether we will need to cool down the solenoid by March, or not.<br>
</li></ul>
<div>Those who are interested in such a run in March should come up with a comprehensive "proposal": explaining what will be measured, what beam conditions (current, radiator etc) and what detectors to be used.</div>
<div><br>
</div>
<div>We will discuss the program some time the next week, at one of the regular meetings, or at a special meeting to be announced.</div>
<div><br>
</div>
<div>Best regards,</div>
<div>Eugene</div>
<div><br>
</div>
<div><br>
</div>
<div><br>
</div>
</div>
</body>
</html>