[Hps-analysis] FW: MC production
Rafayel Paremuzyan
rafopar at jlab.org
Tue Jun 13 21:22:31 EDT 2017
Hello Takaski,
studying background for the positron trigger,
we noticed in the Wab-Beam-Tri,, FEEs are about an order of magnitude
higher than FEEs in the data.
In both samples, MC and data, pulser trigger was used.
Has anyone did similar comparison between data and MC?
Sebouh mentioned that if not correct Form factors are being
used for FEEs, then it can create about x10 effect. Could you confirm
that correct Form factors are being used in Egs5?
Figures below show normalized cluster energy rate distributions from MC
(WBT) and data.
Rafo
Wab-Beam-Tri, pulser trigger
MC_Ecl1.png
Data: pulser trigger
Data_Ecl1.png
On 06/13/2017 04:18 PM, Maruyama, Takashi wrote:
> Any comments are welcome.
>
> Takashi
>
> -----Original Message-----
> From: Maruyama, Takashi
> Sent: Tuesday, June 13, 2017 10:26 AM
> To: Bradley T Yale (btu29 at wildcats.unh.edu); McCormick, Jeremy I.; Graf, Norman A.
> Subject: MC production
>
> Thanks to Jeremy, MC production is getting ready for mass production at SLAC. Since many changes have been made recently, I would like to clarify MC parameters and make proposal for mass production. I would like to present this at the analysis meeting or HPS weekly meeting in the next few weeks. Any comments/additions/corrections are all welcome.
>
> 1) Generator level cuts
> EGS5 (beam_v5.f)
> - FEE cut uses 15 mrad. Do we need to lower to 5mrad?
> - wab cut uses 10 mrad. Do we need to lower to 5mrad?
> MadGraph
> -Tritrig
> alpha=1/137.036
> E(e+,e-) > 50 MeV
> E(e+)+E(e-) > 0.5 GeV
> |theta_y| > 5 mrad
> -Wab
> alpha=1/137.036
> E(gamma) > 50 MeV, |theta_y(gamma)| > 5 mrad
> -ap
> No cuts, but we need to specify A' mass and ctau.
>
> Generator level event generation can be started at SLAC, but we have to make sure the initial random number seeds are different between JLab and SLAC so that we don't duplicate events.
>
> 2) Event generation
> 1.05 GeV
> Beam background: 100 jobs, 500K bunches each
> Tritrig: 1000 jobs, 10,000 events each
> Wab: 1000 jobs, 10,000 events each
> Rad: 100 jobs, 10,000 events each
> Ap: 100 jobs, 10,000 events each for each mass.
>
> 2.3 GeV
> Same as 1.05 GeV
>
> 3) Detector models
> There are ~100 detector models. We need to decide which detector model to use for mass production.
> Please make the list.
>
> 4) Which files to save and where.
> All the generator level files are saved, but only recon files are saved.
> Since tapes cannot be used at SLAC, do we want to transfer all the recon files to JLab?
> At SLAC, the files will be saved in /nfs/slac/g/hps3/data/mc_production . This directory tree may need a clean-up.
>
> 5) What to generate and at what priority.
> 1.05 GeV
> Wab-beam-tri using nominal detector (priority #1)
> Tritrig-wab-beam using nominal detector (priority #2)
>
> 2.3 GeV
> Wab-beam-tri using nominal detector (priority #3)
> Tritrig-wab-beam using nominal detector (priority #4)
>
> 4.4 GeV
> Wab-beam-tri using L0 detector
> Tritrig-wab-beam using L0 detector
>
> We need to decide where to generate. Since wab-beam-tri requires a large disk space, JLab might be the only possibility.
>
> 6) Spreadsheet
> We need a spreadsheet based on Google doc that summarizes all the files and production status/priorities. This spreadsheet must be accessible by all the HPS collaborators (read only).
>
>
> Takashi
>
>
>
> _______________________________________________
> Hps-analysis mailing list
> Hps-analysis at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hps-analysis
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hps-analysis/attachments/20170613/2c9e2ab1/attachment.html>
More information about the Hps-analysis
mailing list