Takashi,

I do not see any 1.5mm data in your project. If we want to finalize the 
analysis of 2015 1.5mm data, it will be necessary. I would advocate that 
it is not a lot of data needed there, we only need it to evaluate the 
radiative fraction there is no background studies, but we would need it 
in a timely manner.

Best,

On 2017-06-13 22:18, Maruyama, Takashi wrote:
> Any comments are welcome.
> 
>   Takashi
> 
> -----Original Message-----
> From: Maruyama, Takashi
> Sent: Tuesday, June 13, 2017 10:26 AM
> To: Bradley T Yale (btu29 at wildcats.unh.edu); McCormick, Jeremy I.;
> Graf, Norman A.
> Subject: MC production
> 
> Thanks to Jeremy, MC production is getting ready for mass production
> at SLAC.  Since many changes have been made recently, I would like to
> clarify MC parameters and make proposal for mass production. I would
> like to present this at the analysis meeting or HPS weekly meeting in
> the next few weeks.  Any comments/additions/corrections are all
> welcome.
> 
> 1) Generator level cuts
>       EGS5 (beam_v5.f)
> 	- FEE cut uses 15 mrad. Do we need to lower to 5mrad?
>                 - wab cut uses 10 mrad. Do we need to lower to 5mrad?
>       MadGraph
> 	-Tritrig
> 	      alpha=1/137.036
> 	      E(e+,e-) > 50 MeV
>                       E(e+)+E(e-) > 0.5 GeV
>                       |theta_y| > 5 mrad
>                 -Wab
>                       alpha=1/137.036
>                       E(gamma) > 50 MeV, |theta_y(gamma)| > 5 mrad
>                 -ap
> 	     No cuts, but we need to specify A' mass and ctau.
> 
>       Generator level event generation can be started at SLAC, but we
> have to make sure the initial random number seeds are different
> between JLab and SLAC so that we don't duplicate events.
> 
> 2) Event generation
>         1.05 GeV
>              Beam background: 100 jobs, 500K bunches each
>              Tritrig: 1000 jobs, 10,000 events each
>              Wab:  1000 jobs, 10,000 events each
>              Rad: 100 jobs, 10,000 events each
>              Ap: 100 jobs, 10,000 events each for each mass.
> 
>         2.3 GeV
>               Same as 1.05 GeV
> 
> 3) Detector models
>       There are ~100 detector models. We need to decide which detector
> model to use for mass production.
>       Please make the list.
> 
> 4) Which files to save and where.
>      All the generator level files are saved, but only recon files are 
> saved.
>      Since tapes cannot be used at SLAC, do we want to transfer all
> the recon files to JLab?
>      At SLAC, the files will be saved in
> /nfs/slac/g/hps3/data/mc_production . This directory tree may need a
> clean-up.
> 
> 5) What to generate and at what priority.
>        1.05 GeV
>                Wab-beam-tri using nominal detector (priority #1)
>                Tritrig-wab-beam using nominal detector (priority #2)
> 
>        2.3 GeV
>                Wab-beam-tri using nominal detector (priority #3)
>                Tritrig-wab-beam using nominal detector (priority #4)
> 
>        4.4 GeV
>                Wab-beam-tri using L0 detector
>                Tritrig-wab-beam using L0 detector
> 
>        We need to decide where to generate. Since wab-beam-tri
> requires a large disk space, JLab might be the only possibility.
> 
> 6) Spreadsheet
>       We need a spreadsheet based on Google doc that summarizes all
> the files and production status/priorities.  This spreadsheet must be
> accessible by all the HPS collaborators (read only).
> 
> 
> Takashi
> 
> 
> 
> _______________________________________________
> Hps-analysis mailing list
> Hps-analysis at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hps-analysis

-- 

Raphaël Dupré
Institut de Physique Nucléaire d'Orsay


More information about the Hps-analysis mailing list