<html>
<head>
<meta content="text/html; charset=ISO-8859-1"
http-equiv="Content-Type">
</head>
<body text="#000000" bgcolor="#FFFFFF">
Hi, <br>
<br>
I posted the notes from the last HPS controls meeting at <br>
<br>
<a class="moz-txt-link-freetext" href="https://confluence.slac.stanford.edu/display/hpsg/2014.04.02+Biweekly">https://confluence.slac.stanford.edu/display/hpsg/2014.04.02+Biweekly</a><br>
<br>
and also pasted them to this message. <br>
<br>
Hovanes. <br>
<br>
<br>
<h2 id="id-2014.04.02Biweekly-Minutes">Minutes</h2>
<p>At JLab: Ani, F.-X., Stepan, Hovanes</p>
<p>At SLAC: Takashi, Pelle</p>
<p>In Glasgow: Bryan</p>
<h6 id="id-2014.04.02Biweekly-SVTMotors">SVT Motors</h6>
<ul>
<li>Takashi showed <a
href="https://confluence.slac.stanford.edu/download/attachments/165090867/2014-03-31StepperMotor.pptx?version=1&modificationDate=1396986671816&api=v2">the
slides that he showed at the HPS beamline meeting</a> which
define what he would like to have for SVT motion control.</li>
<li>The XPS motor driver is already at SLAC</li>
<li>The cable will be ready soon, Hovanes will send at least one
to SLAC for tests.</li>
</ul>
<h6 id="id-2014.04.02Biweekly-SVTvoltages">SVT voltages</h6>
<ul>
<li>Hovanes updated on the status of the EPICS IOC for SVT
voltages. Current the IOC has <br>
<ul>
<li>Bias voltages</li>
<li>FE low voltages</li>
<li>Flange low voltages</li>
</ul>
</li>
<li>Still missing the hybrid LVs. They will not be connected to
any MPOD crates, but will be dummy records in the future to be
replaced by the channels from DAQ CA server.</li>
<li>Ani showed the status of the alarm handler. She has a script
which reads the SQLite file and based on the entries in the file
generates the alarm tree. The groups and channels have guidance
buttons and associated action buttons.</li>
<li>Bryan already sent Ani some MEDM files that she will attached
to the associated action buttons on the alarm screens. </li>
</ul>
<h2 id="id-2014.04.02Biweekly-ActionItems">Action Items</h2>
<ul>
<li>Hovanes will send the motor cable to Takashi once it is ready.
He will also sent the description of the mating connector
pinout.</li>
<li>Hovanes will implement fake records for the hybrid low
voltages on the SVT voltage IOC.</li>
<li>Ani will modify the alarm screens to launch the MEDM screens
for individual voltage channels. </li>
<li>F.-X. will send a drawing with the location of the motors to
Krister. (from previous meetings)</li>
<li>Pelle will find out when the SVT full test at SLAC will take
place and let Bryan know. (from previous meetings)</li>
</ul>
<br>
</body>
</html>