<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    Hi, <br>
    <br>
    I posted the notes from the last HPS controls meeting at <br>
    <br>
<a class="moz-txt-link-freetext" href="https://confluence.slac.stanford.edu/display/hpsg/2014.04.02+Biweekly">https://confluence.slac.stanford.edu/display/hpsg/2014.04.02+Biweekly</a><br>
    <br>
    and also pasted them to this message. <br>
    <br>
    Hovanes. <br>
    <br>
    <br>
    <h2 id="id-2014.04.02Biweekly-Minutes">Minutes</h2>
    <p>At JLab: Ani, F.-X., Stepan, Hovanes</p>
    <p>At SLAC: Takashi, Pelle</p>
    <p>In Glasgow: Bryan</p>
    <h6 id="id-2014.04.02Biweekly-SVTMotors">SVT Motors</h6>
    <ul>
      <li>Takashi showed <a
href="https://confluence.slac.stanford.edu/download/attachments/165090867/2014-03-31StepperMotor.pptx?version=1&amp;modificationDate=1396986671816&amp;api=v2">the
          slides that he showed at the HPS beamline meeting</a> which
        define what he would like to have for SVT motion control.</li>
      <li>The XPS motor driver is already at SLAC</li>
      <li>The cable will be ready soon, Hovanes will send at least one
        to SLAC for tests.</li>
    </ul>
    <h6 id="id-2014.04.02Biweekly-SVTvoltages">SVT voltages</h6>
    <ul>
      <li>Hovanes updated on the status of the EPICS IOC for SVT
        voltages. Current the IOC has <br>
        <ul>
          <li>Bias voltages</li>
          <li>FE low voltages</li>
          <li>Flange low voltages</li>
        </ul>
      </li>
      <li>Still missing the hybrid LVs. They will not be connected to
        any MPOD crates, but will be dummy records in the future to be
        replaced by the channels from DAQ CA server.</li>
      <li>Ani showed the status of the alarm handler. She has&nbsp; a script
        which reads the SQLite file and based on the entries in the file
        generates the alarm tree. The groups and channels have guidance
        buttons and associated action buttons.</li>
      <li>Bryan already sent Ani some MEDM files that she will attached
        to the associated action buttons on the alarm screens.&nbsp;</li>
    </ul>
    <h2 id="id-2014.04.02Biweekly-ActionItems">Action Items</h2>
    <ul>
      <li>Hovanes will send the motor cable to Takashi once it is ready.
        He will also sent the description of the mating connector
        pinout.</li>
      <li>Hovanes will implement fake records for the hybrid low
        voltages on the SVT voltage IOC.</li>
      <li>Ani will modify the alarm screens to launch the MEDM screens
        for individual voltage channels.&nbsp;</li>
      <li>F.-X. will send a drawing with the location of the motors to
        Krister. (from previous meetings)</li>
      <li>Pelle will find out when the SVT full test at SLAC will take
        place and let Bryan know. (from previous meetings)</li>
    </ul>
    <br>
  </body>
</html>