No beam in Hall B tonight. <br>
<br>
<div class="moz-forward-container"><br>
<br>
-------- Original Message --------
<table class="moz-email-headers-table" border="0" cellpadding="0"
cellspacing="0">
<tbody>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">Subject:
</th>
<td>Re: [Hps] [Hallb-engineering] Run schedule and shifts</td>
</tr>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">Date: </th>
<td>Thu, 05 Mar 2015 14:35:30 -0500</td>
</tr>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">From: </th>
<td>Stepan Stepanyan <a class="moz-txt-link-rfc2396E" href="mailto:stepanya@jlab.org"><stepanya@jlab.org></a></td>
</tr>
<tr>
<th nowrap="nowrap" valign="BASELINE" align="RIGHT">To: </th>
<td><a class="moz-txt-link-abbreviated" href="mailto:hallb-engineering@jlab.org">hallb-engineering@jlab.org</a>, <a class="moz-txt-link-abbreviated" href="mailto:hallb@jlab.org">hallb@jlab.org</a>, <a class="moz-txt-link-abbreviated" href="mailto:hps@jlab.org">hps@jlab.org</a></td>
</tr>
</tbody>
</table>
<br>
<br>
<pre>Hi everyone,
Sorry for late notice - all shifts for today swing and Friday owl are
canceled
due accelerator schedule slippage and our tagger vacuum issue. The shift
schedule from swing on Friday, March 6 to owl on Monday, March 9, stays
as was announced in the email below.
Regards, Stepan
RC
On 3/4/15 3:28 PM, Stepan Stepanyan wrote:
> Hello everyone,
>
> Accelerator is planning to setup beam delivery to Hall-B on Thursday
> swing to Friday
> owl, March 5&6. We plan to close the hall on Thursday at 5pm and be
> ready for beam
> by 6pm. Hall will go to restricted access at 6am on Friday, March 6. The
> beam
> destination for Thursday/swing - Friday/owl will be "Hall-B tagger". If
> everything goes
> well with beam delivery to Hall-B and with the machine, we will close
> the hall again on
> Friday swing and run beam till 6 am on Monday morning, March 9. The beam
> destination
> then will be "Hall-B FC".
>
> The HPS shift schedule will be the following:
> - all shift till 4pm on Thursday, March 5 are canceled
> - shift personal for Thursday swing and Friday owl must report to the
> counting house at
> their assigned times (note: worker swing on Thursday should report at 4pm)
> - shifts from 7am to 4pm on Friday are canceled
> - shift personal for Friday (March 6) swing to Monday (March 9) owl must
> report to counting
> house at their assigned times (note: worker swing on Friday should
> report at 4pm)
> - additional email will be sent around for shift schedule after 7am on
> Monday, March 9
>
> Regards, Stepan
> RC
> _______________________________________________
> Hallb-engineering mailing list
> <a class="moz-txt-link-abbreviated" href="mailto:Hallb-engineering@jlab.org">Hallb-engineering@jlab.org</a>
> <a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/hallb-engineering">https://mailman.jlab.org/mailman/listinfo/hallb-engineering</a>
_______________________________________________
Hps mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Hps@jlab.org">Hps@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/hps">https://mailman.jlab.org/mailman/listinfo/hps</a>
</pre>
<br>
</div>
<br>
</body>
</html>