[Hps-ecal] hv currents

Gabriel CHARLES charlesg at ipno.in2p3.fr
Thu Nov 27 12:14:02 EST 2014


Hi Nathan,

   I've tried to access the hv files but:
ifarm1101> cd /home/hpsrun/
/home/hpsrun/: Permission denied.
And:
ifarm1101> ls /home/hpsrun/.ecalhv
ls: cannot access /home/hpsrun/.ecalhv: Permission denied

Is it because I'm not using the JLab network? When you will have time 
could change the permission access please or copy it somewhere I can 
access to?

Regards,
Gabriel

Le 2014-11-26 20:33, Nathan Baltzell a écrit :
> Hi Everyone,
> 
> The one remaining HV group that was not at nominal voltage had its
> current
> limit raised a week ago (to 65 uA, the largest of all channels), and
> we've had
> no trips since then and all channels holding at nominal voltages.
> Here's a pic
> of the channels currently with high draw.
> 
> Also, in ~hpsrun/.ecalhv is a set of text files with current readbacks
> (filenames
> contain timestamp). These are set to go to a database automatically
> before
> long, but meanwhile I have a cronjob recording them hourly in those
> text files
> for at least the past week (there were some blips due to ioc/network
> changes
> early last week). Intent is to see the time-dependence, just need to
> write a
> script to read and plot them ...
> 
> -Nathan
> 
> Begin forwarded message:
> 
>> From: Gabriel CHARLES <charlesg at ipno.in2p3.fr>
>> 
>> Subject: Re: [Hps] Run schedule for next week
>> 
>> Date: November 26, 2014 4:10:16 PM EST
>> 
>> To: Nathan Baltzell <baltzell at jlab.org>
>> 
>> If I am right there is one HV group that do not work at nominal
>> value, should we take care of it during the HPS target assembly?
>> 
>> Le 2014-11-26 15:57, Nathan Baltzell a écrit :
>> 
>>> Dear Everyone,
>>> Next week the accelerator will work to resume multi-hall
>>> operation, and
>>> it is possible Hall-B will have beam as early as Thursday evening.
>>> So, shifts in the Hall-B counting room are set to resume on
>>> Thursday,
>>> December 4 with the swing shifts.
>>> The previously planned down time Dec. 5-12 has been cancelled and
>>> will
>>> now need to have shifts manned.
>>> The plan is for the HPS target assembly to have been installed and
>>> tested
>>> by Wednesday, and the full beamline returned to vacuum and the
>>> hall closed
>>> on Thursday. Then take beam to the tagger dump and repeat and
>>> finish
>>> quality studies, and then do the same with beam to the Faraday
>>> cup.
>>> Regards,
>>> Nathan
>>> _______________________________________________
>>> Hps mailing list
>>> Hps at jlab.org
>>> https://mailman.jlab.org/mailman/listinfo/hps
>> 
>> --
>> Gabriel CHARLES
>> Institut de Physique Nucléaire d'Orsay
> 
> 
> _______________________________________________
> Hps-ecal mailing list
> Hps-ecal at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hps-ecal

-- 
Gabriel CHARLES
Institut de Physique Nucléaire d'Orsay


More information about the Hps-ecal mailing list