<html><head><meta http-equiv="Content-Type" content="text/html charset=iso-8859-1"></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; "><div>Hi Everyone,</div><div><br></div>The one remaining HV group that was not at nominal voltage had&nbsp;its current<div>limit raised a week ago (to 65 uA, the largest of all&nbsp;channels), and we've had</div><div>no trips since then and all channels holding at nominal voltages. &nbsp;Here's a pic</div><div>of the&nbsp;channels currently with high draw.</div><div><br></div><div>Also, in ~hpsrun/.ecalhv is a set of text files with current readbacks (filenames</div><div>contain timestamp). &nbsp;These are set to go to a database automatically before</div><div>long,&nbsp;but meanwhile I have a cronjob recording them hourly in those text files</div><div>for at least&nbsp;the past&nbsp;week (there were some blips due to ioc/network changes</div><div>early last week). &nbsp;Intent is to see the time-dependence, just need to write a</div><div>script to read and plot them ...</div><div><br></div><div><div>-Nathan</div><div><br></div><div><br></div><div><img height="134" width="378" apple-width="yes" apple-height="yes" id="a08711ae-4050-44cd-a3ef-6748254507dd" src="cid:C6D21F3E-C6AB-4A92-9431-990BDEB73430@home"></div><div><br><div><br></div><div><br></div><div><br><div>Begin forwarded message:</div><br class="Apple-interchange-newline"><blockquote type="cite"><div style="margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 0px;"><span style="font-family:'Helvetica'; font-size:medium; color:rgba(0, 0, 0, 1.0);">From: </span><span style="font-family:'Helvetica'; font-size:medium;">Gabriel CHARLES &lt;<a href="mailto:charlesg@ipno.in2p3.fr">charlesg@ipno.in2p3.fr</a>&gt;<br></span></div><div style="margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 0px;"><span style="font-family:'Helvetica'; font-size:medium; color:rgba(0, 0, 0, 1.0);">Subject: </span><span style="font-family:'Helvetica'; font-size:medium;">Re: [Hps] Run schedule for next week<br></span></div><div style="margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 0px;"><span style="font-family:'Helvetica'; font-size:medium; color:rgba(0, 0, 0, 1.0);">Date: </span><span style="font-family:'Helvetica'; font-size:medium;">November 26, 2014 4:10:16 PM EST<br></span></div><div style="margin-top: 0px; margin-right: 0px; margin-bottom: 0px; margin-left: 0px;"><span style="font-family:'Helvetica'; font-size:medium; color:rgba(0, 0, 0, 1.0);">To: </span><span style="font-family:'Helvetica'; font-size:medium;">Nathan Baltzell &lt;<a href="mailto:baltzell@jlab.org">baltzell@jlab.org</a>&gt;<br></span></div><br><div>If I am right there is one HV group that do not work at nominal value, should we take care of it during the HPS target assembly?<br><br>Le 2014-11-26 15:57, Nathan Baltzell a écrit&nbsp;:<br><blockquote type="cite">Dear Everyone,<br>Next week the accelerator will work to resume multi-hall operation, and<br>it is possible Hall-B will have beam as early as Thursday evening.<br>So, shifts in the Hall-B counting room are set to resume on Thursday,<br>December 4 with the swing shifts.<br>The previously planned down time Dec. 5-12 has been cancelled and will<br>now need to have shifts manned.<br>The plan is for the HPS target assembly to have been installed and tested<br>by Wednesday, and the full beamline returned to vacuum and the hall closed<br>on Thursday. &nbsp;Then take beam to the tagger dump and repeat and finish<br>quality studies, and then do the same with beam to the Faraday cup.<br>Regards,<br>Nathan<br>_______________________________________________<br>Hps mailing list<br><a href="mailto:Hps@jlab.org">Hps@jlab.org</a><br>https://mailman.jlab.org/mailman/listinfo/hps<br></blockquote><br>-- <br>Gabriel CHARLES<br>Institut de Physique Nucléaire d'Orsay<br></div></blockquote></div><br></div></div></body></html>