[Hps] Second draft of the HPS Test Run NIM paper

Hansson Adrian, Per Ola phansson at slac.stanford.edu
Wed Apr 9 12:24:10 EDT 2014


Dear All,

this is a second circulation of the Test Run paper aimed to be published in NIM.

This version, 2.5, contains in many aspect a new version of the draft based on feedback since the collaboration meeting. 

Please read and give feedback before Wed April 23rd. 

The actual paper can be found under the PPC pages on confluence. Please let me know of you don’t have access to this page (it’s probably a good idea to get access to the confluence pages anyway). 

The link is here:

https://confluence.slac.stanford.edu/display/hpsg/Test+run+NIM+paper+Collaboration+Review

Cheers,

	Pelle


On Dec 3, 2013, at 4:45 PM, Per Hansson Adrian <phansson at slac.stanford.edu> wrote:

> Dear All,
> 
> this is the first circulation of v1.0 draft of the Test run paper aimed to be published in NIM. 
> 
> Please see this link: https://confluence.slac.stanford.edu/download/attachments/154928386/hps-testrun-nim-v1_0.pdf?version=1&modificationDate=1386117406086&api=v2
> 
> Although complete, being the first draft there are a few things that we know will change and below is a list of them.
> - Add data rate estimation to SVT DAQ
> - Add data flow diagram for SVT DAQ
> - Update style of SVT time residual plot.
> - Improved ECal calibration (E/p plot will be updated) and updated trigger turn-on for data and simulation
> - Update to angular distribution analysis incl. calibration uncertainty 
> Most of these known changes will have a small impact on the general outline or any conclusion. 
> 
> Please send me comments, questions and suggested edits before Dec. 20th i.e. before holidays. 
> 
> Thank you,
> 
> 	Pelle (for the editors).
> 
> 




More information about the Hps mailing list