[Hps] run update
Nathan Baltzell
baltzell at jlab.org
Fri May 8 17:39:20 EDT 2015
No official news on the safety violation review, but the PD relayed just
recently that we should still be prepared for beam tomorrow evening.
So the current plan is to resume with swing shifts tomorrow.
-Nathan
On May 8, 2015, at 10:24, Nathan Baltzell <baltzell at jlab.org> wrote:
> Hello Everyone,
>
> There was a safety violation in Hall-B last night. After a few minutes of
> beam on the tagger dump, the interlock for the truck ramp access door
> was triggered (faultily). This required a resweep of the hall, but the hall
> was not surveyed first before entering, resulting in a safety violation that
> must be reviewed before beam operations can be resumed. The review
> is in progress. Stay tuned.
>
> -Nathan
>
> _______________________________________________
> Hps mailing list
> Hps at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hps
More information about the Hps
mailing list