Dear all,
First of all sorry for missing my first RC meeting. Just came out of the hall, a lot is going on here.
We are almost ready, 3-4 hours of work left to close the hall if everything goes well. The remaining work includes finishing with SVT cooling connections, installing the target, and closing the vacuum chambers. After that, we can connect the vacuum pipe through the first Frascati and pump down the system. So far the main issue is to get a good vacuum upstream of the chicane. Other minor things are installing the hodoscope PMTs (ongoing), finishing the downstream beamline (ongoing), and finishing positioning the ECal (within the next hour).
We will send an email on the status of hall closing and shifts in a couple of hours.
Regards, Stepan