Colleagues,<br>
Below are some screenshots of the CEBAF Commissioning
schedule/plans. For those lucky enough to be on the right side of
the JLAB firewall, you can visit these pages at:
<a class="moz-txt-link-freetext" href="http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF">http://opsweb.acc.jlab.org/TJ3/12GeV_CEBAF</a>. There will
undoubtedly be some confusion since the plan does say anything about
beam to Hall-B for HPS (or much beam to any other hall). That is
a battle that is yet to be waged. But for now if commissioning
goes well, one could think of supporting a physics program in
parallel with 4.4.2 - 4.4.5 activities in AccIII and for most of
4.5 (AccIV). Activities 4.5.3 and 4.5.4 are placed there to as per
the 12GeV project schedule, this 12GeV schedule is up for
re-baselining in a couple of months. This whole plan is in flux
and it is my intention to keep these pages as up to date as I can,
and as the plan matures so will the level of detail as well as the
amount of confusion. <br>
<br>
Arne<br>
<pre class="moz-signature" cols="72"><img alt="" src="cid:part1.00060501.09030908@jlab.org" height="832" width="1578">
<img alt="" src="cid:part2.08040202.00000402@jlab.org" height="756" width="1574">
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a>
Newport News, VA 23606 </pre>
</body>
</html>