    All,<br>
    <br>
    For the past few years Hall B has been busy with installation of
    equipment for CLAS12 and with the preparation of new experiments
    such as HPS and PRAD. We also expect to receive new equipment this
    year from our collaborators overseas. Some of the installation work
    also requires help from the Jefferson Lab support groups. In order
    to ensure high quality work in Hall B I want to remind everyone who
    is planning to conduct any work in Hall B of the requirement to go
    through the following steps:<br>
    <ol>
      <li>Notify the Hall B  Work Coordinator, Doug Tilles
        (<a class="moz-txt-link-abbreviated" href="mailto:tilles@jlab.org">tilles@jlab.org</a>), of any work to be done in Hall B </li>
      <li>Discuss the work in detail with Doug Tilles and do a walk
        through. This may also require reviews of drawing and
        calculation, which will be carried out by Hall B lead engineer
        Bob Miller (<a class="moz-txt-link-abbreviated" href="mailto:rmiller@jlab.org">rmiller@jlab.org</a>) <br>
      </li>
      <li>The Work Coordinator will observe the work and inspect it when
        it is complete</li>
      <li>If the Work Coordinator deems the work to be correct and done
        professionally, the job is complete</li>
      <li>If the Work Coordinator deems the work does not meet Hall B
        standards, it must be corrected</li>
    </ol>
    <p>Doug Tilles already uses these steps for work done by the Hall B
      technicians, so this requirement just extends the steps to all
      work done in the Hall (including cabling, gas system, DAQ,
      and future experimental equipment). Doug Tilles will be assisted
      by Denny Insley (<a class="moz-txt-link-abbreviated" href="mailto:dinsley@jlab.org">dinsley@jlab.org</a>) and by Bob Miller to make sure
      that all work is done professionally.<br>
    </p>
    <p><b>Note that these requirements do not replace the technical and
        safety reviews of new equipment brought to JLab and Hall B but
        are in addition to those.    </b><br>
    </p>
    <p>Thank you for your cooperation,</p>
    <p>Volker Burkert<br>
      Head of Hall B department <br>
    </p>