[Isotope-prod] Letter to Marc Garland - Revised

Stephen Benson felman at jlab.org
Tue May 29 10:43:49 EDT 2018


Hari,

Kelly and I are working on the budget.  Note that the high energy exposure location in the LERF will be past the 1G dump in the straight ahead beamline rather than in the 1G dump.  We will still use the 1G dump line to measure the energy but it is easier to put the target into the straight ahead beam line downstream of the dump.

Steve Benson


> On May 28, 2018, at 9:31 PM, Hari Areti <areti at jlab.org> wrote:
> 
> Please ignore the previous :"Dear Marc" Attachment. I have added an item which I missed previously. Thanks.
> -H
> From: "Hari Areti" <areti at jlab.org>
> To: "isotope-prod" <isotope-prod at jlab.org>
> Cc: "Steve Benson" <felman at jlab.org>, "Mike Spata" <spata at jlab.org>, "Todd" <satogata at jlab.org>
> Sent: Monday, May 28, 2018 8:55:33 PM
> Subject: Letter to Marc Garland - moving all experiemts to LERF
> 
> Dear Collaborators,
> 
> Here is a draft letter to be sent to Marc Garland enumerating the changes in our proposal.Send your feedback. We should plan to send it to Marc by week's end.
> I also would like to add personnel changes as follows:
> 
> The following set shows minor changes of personnel that do not impact the execution of the proposal
> 
> Dr. Andrew Hutton stepped down as Associate Director of Accelerators and is a full time scientist at the lab.
> Prof. Douglas Wells moved from SDSMT to New Mexico Institute of Mining and Technology and continues to participate in the collaboration
> Dr. George Kharashvili left the lab
> 
> The work that George has been doing should be picked up by some one
> 
> Other things to note.-
> 
> Doug:
> We said that you had identified a student when you ere at SDSMT.  Do you want to address that?
> 
> Kevin Jordan and Steve Benson:
> 
> I did not want to change the energies we planned to use at CEBAF injector. I am assuming that we can use LERF to reproduce the energies.
> In the figure in the letter you will see that I identified a place for higher energy LERF beam. Please verify and modify as suitable.
> 
> Steve Benson:
> 
> We will have to edit the budget numbers on page 1 of the proposal with the LERF hot checkout costs. Please work with Kelly Hanifan to get a revised FWP.
> 
> Thanks.
> 
> -H
> 
> 
> 
> 
> <Letter to Marc Garland.docx>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20180529/14bd0960/attachment.html>


More information about the Isotope-prod mailing list