The magnetron commissioning OSP is signed off, we had a walk through with Harry Fanning, Phillip Stanley, Bonnie Rodriguez, Billy Formichelli, Charlie Garrison, & myself. The locks were removed & breakers energized to the transmitter cabinet. The two 480 VAC breakers on the transmitter are both remote lever/cable actuated so, per procedure, there are no arc flash hazards when turning these levers ON/OFF as long as the main cabinet door is closed. Three of the four AVTs have been tested - the fourth is for the 480 VAC supply to the high voltage transmitter transformer & will be tested when all interlocks are satisfied. Next steps are to fill the cooling water circuits & test interlocks - if all goes well we should make some RF next week.
Thanks all for the support!
Kevin
[cid:AAC60375-E8FA-4A75-B497-72C56008A41B]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20211215/079cc974/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: PastedGraphic-1.tiff
Type: image/tiff
Size: 576046 bytes
Desc: PastedGraphic-1.tiff
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20211215/079cc974/attachment-0001.tiff>
More information about the Isotope-prod
mailing list