Dear Team,
We began the 34 hour, 5kWatt irradiation today on 60 grams of naturally occurring gallium, 99.9995% pure, in a graphite crucible at 13:15. All systems are nominal. Swing shift operator Eric said he has not had a single trip yet on his shift. The machine is performing very well.
There is some degradation of the photocathode Qe, but in speaking with Carlos we are optimistic & if not he has a plan.
The operation staff have done a great job running the machine - makes me jealous I can not hop in the seat anymore!
Thanks everyone for the support to get this run in!
Best regards,
Kevin
[cid:11A84AF8-4618-44FF-893E-7E6F034D937A]
[https://logbooks.jlab.org/files/2021/01/3863039/210113150.1.png][https://logbooks.jlab.org/files/2021/01/3863039/210113150.1.png]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20210114/1aa8d797/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Start of 5kW run.png
Type: image/png
Size: 93195 bytes
Desc: Start of 5kW run.png
URL: <https://mailman.jlab.org/pipermail/isotope-prod/attachments/20210114/1aa8d797/attachment-0001.png>
More information about the Isotope-prod
mailing list