[Isotope-prod] No 11:00 Meeting today
Kevin Jordan
jordan at jlab.org
Wed Sep 22 10:15:57 EDT 2021
The instrument air dryer failed and contaminated the building air lines with water. We are waiting on part to repair the system. The GTS has been valved out from the instrument air and was connected to the dry nitrogen system, all GTS air lines were purged and dried out so Carlos & Bubba could continue with the GTS gun work.
We need a plan to purge the remainder of the system once the dryer is repaired.
There is still no decision on testing the LCLSII HE VM (verification module) in the LERF.
Kevin