<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
</head>
<body style="word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;" class="">
HI All,
<div class="">I will have a short update meeting at 11:00 today;</div>
<div class=""><br class="">
</div>
<div class=""><a href="https://bluejeans.com/294836101?src=calendarLink" class="">https://bluejeans.com/294836101?src=calendarLink</a></div>
<div class=""><br class="">
<div class="">Recent activities:</div>
<div class="">Sept. 14 - 18; LERF was run for isotope irradiations </div>
<div class="">Sept. 23; Shield blocks were removed from the LERF truck ramp</div>
<div class="">Sept. 28; LCLS-II CM20 was removed from the LERF and transported to the test lab</div>
<div class="">Daily - Gamma spectroscopy performed on the irradiated Gallium sample</div>
<div class=""><br class="">
</div>
<div class="">Things needing attention:</div>
<div class="">Quarter CM cavity #3 HPA still tries on crowbar</div>
<div class="">Remove clean room from LERF vault and deliver to test lab</div>
<div class=""><br class="">
</div>
<div class="">Future activities:</div>
<div class="">Week of October 12;<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>ERR Review for 5 kwatt irradiation </div>
<div class=""><br class="">
</div>
<div class="">Week of October 26:</div>
<div class=""><span class="Apple-tab-span" style="white-space:pre"></span>Reinstall shield blocks<br class="">
<br class="">
November 9 - 12;<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>Re-run “Stack' arrangement using metallic Ga71 (1 hour, 100 watts)<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>Run solid block of graphite to validate temperatures (~20 minutes, 5 kw)<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>Run graphite crucible with natural occurring Gallium for 30 hours, this sample would not leave JLab - gamma spec done by RadCon to validate Fluka model<br class="">
<br class="">
January 11 - 14;<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>Possible “Stack” exposure w/metalic Ga71 to refine Fluka results<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>Run naturally occurring Gallium at 5 kw and transfer for isotope separation <br class="">
<br class="">
April 12 - 15;<br class="">
<span class="Apple-tab-span" style="white-space: pre;"></span>Run new 50 kw target at 5 kw to validate design & model</div>
<div class=""><br class="">
</div>
<div class="">Thanks,</div>
<div class="">Kevin</div>
<div class=""><br class="">
</div>
<div class=""><br class="">
</div>
<div class=""><br class="">
</div>
</div>
</body>
</html>