<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
</head>
<body dir="auto">
Hi All,
<div>The next isotope run will be in January, not the week after Thanksgiving. This decision was made in light of UITF/HDice running & required support as well as additional ERR for 5 kwatt run. </div>
<div><br>
</div>
<div>The new hardware (photo) has much better cooling & better defined geometry (1mm gap from Tungsten radiator to graphite crucible) for validating FLUKA models. There are a couple brazes left & to tie in cooling piping.</div>
<div><br>
</div>
<div>There will be opportunities for HCO in Nov/Dec since the shield blocks will go back in soon. The 1/4 CM crowbar faults need to be addressed.</div>
<div><br>
</div>
<div>Stay safe all,</div>
<div>Kevin</div>
<div><br>
</div>
<div>  <img src="cid:9DD78BD6-EC8D-4BC7-A3F7-1842A3EB5462-L0-001"><br>
<br>
<div dir="ltr">Sent from my iPad</div>
</div>
</body>
</html>