<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=Windows-1252">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Hi Kevin,</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
The 11/11 gun task still incorrectly shows "Gun HV processing", which is misleading.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
You can make more succinct, but the tasks is to determine "Does raising the gun HVPS trip limit from 0.5 to 1 mA mitigate HV processing the LERF gun Jan 4-8"</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
You can attach this ATLIS instead too - <br>
</div>
<div><a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21480" id="LPlnk483887">http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21480</a><br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Joe<br>
</div>
<div>
<div id="appendonsend"></div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="divRplyFwdMsg" dir="ltr"><font style="font-size:11pt" face="Calibri, sans-serif" color="#000000"><b>From:</b> Isotope-prod <isotope-prod-bounces@jlab.org> on behalf of Kevin Jordan <jordan@jlab.org><br>
<b>Sent:</b> Wednesday, November 4, 2020 8:55 AM<br>
<b>To:</b> isotope-prod@jlab.org <isotope-prod@jlab.org><br>
<b>Subject:</b> [Isotope-prod] Update, NO 11:00 Meting today</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt">
<div class="PlainText">HI Folks,<br>
<br>
The isotope production team is working on the documentation for upcoming ERR for the 5 kilowatt run.<br>
<br>
RF Group - Starting next week we are able to go to power permit, I would request that the quarter are brought to HV to get crowbar fixed & to be sure that there are no surprises come January. We are at 4K so it limits what can be run… but the crowbar was tripping
in HV (w/o RF ON).<br>
<br>
Dates to keep in mind…<br>
<br>
Nov. 9, 2020 - Shield block re-installation<br>
<br>
Nov. 11, 2020 - Gun HV processing - Beam Permit & Ops support<br>
<br>
TBD - Next ERR for 5 kilowatt isotope run<br>
<br>
Dec. ?, 2020 - Reinstall 1X Dipole Power Supply<br>
<br>
Jan. 4 - 8, 2021 Hot Check Out for 1X Run + gun check<br>
<br>
Jan. 11 - 15, 2021 - 5 kilowatt isotope run<br>
<br>
~ April, 2021 - Isotope run<br>
<br>
Things to do…<br>
<br>
Solenoid power supply still has not yet been installed in 1/4 CM CPS & crowbar need attention<br>
<br>
Stay safe my friends,<br>
Kevin<br>
<br>
_______________________________________________<br>
Isotope-prod mailing list<br>
Isotope-prod@jlab.org<br>
<a href="https://mailman.jlab.org/mailman/listinfo/isotope-prod">https://mailman.jlab.org/mailman/listinfo/isotope-prod</a><br>
</div>
</span></font></div>
</div>
</body>
</html>