Hi All,
<div class="">Here is the link:</div>
<div class=""><br class="">
</div>
<div class=""><a href="https://bluejeans.com/294836101?src=calendarLink" class="">https://bluejeans.com/294836101?src=calendarLink</a></div>
<div class=""><br class="">
</div>
<div class="">Agenda:</div>
<div class=""><br class="">
</div>
<div class="">Isotopes:</div>
<div class="">Fix all save</div>
<div class=""><br class="">
</div>
<div class="">RF is still giving trouble minimum repair time 3 hours</div>
<div class=""><span class="Apple-tab-span" style="white-space:pre"></span>Filament board in FL02-2</div>
<div class=""><span class="Apple-tab-span" style="white-space:pre"></span>Circulator load in FL02-7</div>
<div class="">The waveguide will be open so lock is being put on the gun to prevent beam.</div>
<div class=""><br class="">
</div>
<div class="">Beam viewers need some work upstair to get beamanizer functioning, the 1X beam viewer needs alignment since the camera was bumped - this should have been found in HCO…</div>
<div class=""><br class="">
</div>
<div class="">Since the vault is open to put the lock on the viewer can be aligned - this one is critical for setting the beam to the isotope target.</div>
<div class=""><br class="">
</div>
<div class="">Next steps:</div>
<div class="">Get beam ON</div>
<div class="">Get past 1X & phase SRF cavities to establish energy</div>
<div class="">Align beam to YAG screen in tungsten holder</div>
<div class="">Access to replace solid graphite block with foil stack (labeled G2), remove YAG viewer & install tungsten radiator</div>
<div class="">Irradiate foil stack at 100 Watts for 1 hour</div>
<div class="">Allow for cool down & exchange foil stack with solid graphite block  (labeled G1)</div>
<div class="">Irradiate until temperatures stabilize </div>
<div class="">Remove and install graphite crucible with gallium load, send before & after photos & temperature data to ERR team</div>
<div class="">Once permission is granted begin target irradiation for up to 34 hours</div>
<div class=""><br class="">
</div>
<div class="">Shut down & survey vault, lock shielding in place, rope off as needed.</div>
<div class="">Take CHL at to 4˚k</div>
<div class=""><br class="">
</div>
<div class="">LSLC-II HE:</div>
<div class="">Upcoming work:</div>
<div class="">Move SSAs into place - due ~ Late April</div>
<div class="">Connect waveguide & circulators - due ~ May</div>
<div class="">Test SSAs into shorts  - Finish late May / early June</div>
<div class="">Grout cry can base plate to minimize microphonics - Due ~ June</div>
<div class="">Move blocks & install cryomodule ~ Mid July</div>
<div class="">Begin cool down and testing  ~ Mid August</div>