That is Great progress, Kevin. I was there yesterday late afternoon. I guess you still has a lot of low level PLC work. Do you need me to be with you tomorrow? I plan to be there for something else, but I can redirect my work for the LERF. If you are going
to have RF power to generate, I need to bring RF power meter and spectrum analyzer to there too.</div>
<div style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);" dir="ltr">
Haipeng </div>
</div>
<div id="ms-outlook-mobile-signature">
<div><br>
</div>
Get <a href="https://aka.ms/o0ukef">Outlook for iOS</a></div>
</div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Robert Rimmer <rarimmer@jlab.org><br>
<b>Sent:</b> Wednesday, December 15, 2021 12:52:25 PM<br>
<b>To:</b> Kevin Jordan <jordan@jlab.org>; isotope-prod@jlab.org <isotope-prod@jlab.org>; LCLS II @ LERF <lerftest@jlab.org><br>
<b>Cc:</b> Haipeng Wang <haipeng@jlab.org>; Bonnie Rodriguez <bonnie@jlab.org>; Phillip Stanley <pstanley@jlab.org>; Tim Fitzgerald <tfitzger@jlab.org><br>
<b>Subject:</b> Re: LERF Update - Magnetron commissioning has begun!</font>
<div> </div>
</div>
<style type="text/css" style="display:none">
<!--
p
{margin-top:0;
margin-bottom:0}
-->
</style>
<div dir="ltr">
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
awesome, thanks Kevin!</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Bob.</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div id="x_appendonsend"></div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="x_divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" color="#000000" style="font-size:11pt"><b>From:</b> Kevin Jordan <jordan@jlab.org><br>
<b>Sent:</b> Wednesday, December 15, 2021 12:49 PM<br>
<b>To:</b> isotope-prod@jlab.org <isotope-prod@jlab.org>; LCLS II @ LERF <lerftest@jlab.org><br>
<b>Cc:</b> Robert Rimmer <rarimmer@jlab.org>; Haipeng Wang <haipeng@jlab.org>; Bonnie Rodriguez <bonnie@jlab.org>; Phillip Stanley <pstanley@jlab.org>; Tim Fitzgerald <tfitzger@jlab.org><br>
<b>Subject:</b> LERF Update - Magnetron commissioning has begun!</font>
<div> </div>
</div>
<div class="" style="word-wrap:break-word; line-break:after-white-space">The magnetron commissioning OSP is signed off, we had a walk through with Harry Fanning, Phillip Stanley, Bonnie Rodriguez, Billy Formichelli, Charlie Garrison, & myself. The locks were
removed & breakers energized to the transmitter cabinet. The two 480 VAC breakers on the transmitter are both remote lever/cable actuated so, per procedure, there are no arc flash hazards when turning these levers ON/OFF as long as the main cabinet door is
closed. Three of the four AVTs have been tested - the fourth is for the 480 VAC supply to the high voltage transmitter transformer & will be tested when all interlocks are satisfied. Next steps are to fill the cooling water circuits & test interlocks - if
all goes well we should make some RF next week.
<div class="">Thanks all for the support!</div>
<div class="">Kevin</div>
<div class=""><br class="">
</div>
<div class=""><img id="x_x_F9E4C7D6-437E-43BD-892C-3A5CE01687C8" class="" data-outlook-trace="F:1|T:1" src="cid:AAC60375-E8FA-4A75-B497-72C56008A41B"><br class="">
<div class=""><br class="">
</div>
<div class=""><br class="">
</div>
</div>
</div>
</div>
</body>
</html>