<html><body><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Kevin,</div><div><br data-mce-bogus="1"></div><div>I think by code you have to have 3 ft spacing. </div><div>Also with 18" spacing behind some of the SSAs you will not be able to open the back door of SSA cabinet if access is need. These cabinets are 30" wide. Is that a concern?<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>What I could do as an option is to install RF Interface chassis and contactors in the rack.This would eliminate the need for the access to the old racks.<br></div><div>In this case I'd need a floor space for additional rack.<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>A separate issue is power connections from PSS to SSAs. </div><div>What is the planned location of the PSS panel (assuming we'll go with this solution)?<br data-mce-bogus="1"></div><div>What are the planned cable paths?</div><div>Are you planning for cable trays etc.?<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>We might be more effective discussing these issues in person. Please set up a meeting with interested parties if you think it's going to be better/faster way.<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>Thank you,<br data-mce-bogus="1"></div><div>Jerry<br data-mce-bogus="1"></div><div><br></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Kevin Jordan" <jordan@jlab.org><br><b>To: </b>"Jaroslaw Kowal" <jkowal@jlab.org><br><b>Cc: </b>"LCLS II @ LERF" <lerftest@jlab.org><br><b>Sent: </b>Wednesday, October 11, 2017 5:22:29 PM<br><b>Subject: </b>Re: [Lerftest] Waveguide review slides posted<br></div><div><br></div><div data-marker="__QUOTED_TEXT__">Jerry,<div>Yes the tape is within an inch of final location, it looks to be 32”from the rack to the SSA, is that enough?</div><br><div>Thanks</div><div>Kevin</div><br><div><img src="cid:DE053F60-01A3-433F-808E-CE585D540C41" alt="image1.png" id="DE053F60-01A3-433F-808E-CE585D540C41"><br></div><div><br><div id="AppleMailSignature">Sent from my iPad</div><div><br>On Oct 11, 2017, at 5:11 PM, Jaroslaw Kowal <<a href="mailto:jkowal@jlab.org" target="_blank">jkowal@jlab.org</a>> wrote:<br><br></div><blockquote><div><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Kevin,</div><br><div>I'd like to raise concern regarding the spacing behind the SSAs.<br></div><div>The first rack to the left of HPA houses PSS RF Interface chassis and cross connects. Access to the front of this rack is required for PSS Certification and in case of maintenance.<br></div><div>We'll have to check if there will be enough space to perform these duties.<br></div><div>Could someone estimate the spacing from the back of the SSA to this rack? Can I depend on floor marking for this measurement?<br></div><br><div>Thank you,<br></div><div>Jerry<br></div><br><hr id="zwchr"><div><b>From: </b>"Kevin Jordan" <<a href="mailto:jordan@jlab.org" target="_blank">jordan@jlab.org</a>><br><b>To: </b>"LCLS II @ LERF" <<a href="mailto:lerftest@jlab.org" target="_blank">lerftest@jlab.org</a>><br><b>Sent: </b>Wednesday, October 11, 2017 3:58:54 PM<br><b>Subject: </b>[Lerftest] Waveguide review slides posted<br></div><br><div>The LCLS-II waveguide layout review was held this AM, the slides have been posted to the wiki:<br><br><a href="https://wiki.jlab.org/lerf/index.php/Reviews" target="_blank">https://wiki.jlab.org/lerf/index.php/Reviews</a><br><br>Comments and questions from the review will also be posted shortly.<br><br>Kevin<br>_______________________________________________<br>Lerftest mailing list<br><a href="mailto:Lerftest@jlab.org" target="_blank">Lerftest@jlab.org</a><br><a href="https://mailman.jlab.org/mailman/listinfo/lerftest" target="_blank">https://mailman.jlab.org/mailman/listinfo/lerftest</a><br data-mce-bogus="1"></div></div></div></blockquote></div><br></div></div></body></html>