<p style="margin-top:0;margin-bottom:0">Hi Kevin, From this can I assume that sometime between the blocks coming out & going back in both LCLSII CM get removed & returned to the Test Lab/shipped to ???</p>
<p style="margin-top:0;margin-bottom:0">If this is correct then we will need to look at the time line as we will also supporting the Accel. </p>
<p style="margin-top:0;margin-bottom:0">n</p>
</div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Lerftest <lerftest-bounces@jlab.org> on behalf of Kevin Jordan <jordan@jlab.org><br>
<b>Sent:</b> Wednesday, August 7, 2019 7:42:57 AM<br>
<b>To:</b> LCLS II @ LERF <lerftest@jlab.org>; isotope-prod <isotope-prod@jlab.org><br>
<b>Subject:</b> [Lerftest] Look ahead...</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt;">
<div class="PlainText">Here is what the next couple months are looking like:<br>
<br>
Finish 1X dump shielding, instrumentation, and cooling water connections<br>
        Joe & Kevin will bring out SS 1/4” tubing beyond SEG blocks & Installation crew will tie into the dump water skid<br>
<br>
Shield blocks will be removed Sept 5, blocks to be reinstalled in late Sept/early Oct.<br>
<br>
LCLS-II cryomodules will be warmed up ~ week of Sept. 10<br>
        Mike/Curt are discussing with SLAC additional tests on CMs/LLRF since run is extended<br>
<br>
The drive laser parts are due in the next couple weeks - we would like to do a CW run to the 1G dump prior to CHL reconfiguration ~Last week of Aug?<br>
<br>
Readiness review in Sept? EH&S chapter still in review<br>
<br>
1kWatt isotope run in Oct?<br>
<br>
No more LCLS-II CMs till HE (high energy upgrade) ~ 20 months<br>
<br>
Kevin<br>
<br>
_______________________________________________<br>
Lerftest mailing list<br>
Lerftest@jlab.org<br>
<a href="https://mailman.jlab.org/mailman/listinfo/lerftest">https://mailman.jlab.org/mailman/listinfo/lerftest</a><br>
</div>
</span></font></div>
</body>
</html>