<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
</head>
<body style="word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;" class="">
The magnetron commissioning OSP is signed off, we had a walk through with Harry Fanning, Phillip Stanley, Bonnie Rodriguez, Billy Formichelli, Charlie Garrison, & myself. The locks were removed & breakers energized to the transmitter cabinet. The two 480 VAC
breakers on the transmitter are both remote lever/cable actuated so, per procedure, there are no arc flash hazards when turning these levers ON/OFF as long as the main cabinet door is closed. Three of the four AVTs have been tested - the fourth is for the
480 VAC supply to the high voltage transmitter transformer & will be tested when all interlocks are satisfied. Next steps are to fill the cooling water circuits & test interlocks - if all goes well we should make some RF next week.
<div class="">Thanks all for the support!</div>
<div class="">Kevin</div>
<div class=""><br class="">
</div>
<div class=""><img apple-inline="yes" id="F9E4C7D6-437E-43BD-892C-3A5CE01687C8" src="cid:AAC60375-E8FA-4A75-B497-72C56008A41B" class=""><br class="">
<div class=""><br class="">
</div>
<div class=""><br class="">
</div>
</div>
</body>
</html>