Quick update on the status of the installation and RTPC -

We have solenoid, IC and hodoscope mounted ready for survey.
Every thing looks fine with exception of couple of minor issues.
Solenoid-IC-hodoscope is scheduled to be surveyed on Monday.
Most likely we will move RTPC to the Hall on Tuesday.

In the EEL, we have two crates with 23 cards running. Sergei works
on the software. Pre-amps are connected on the RTPC side. Target is
in place with two calibration sources. Tomorrow we will run final tests
to see how detector response to the sources and will connect cables on
FEC side. Gas system will be tested at the same time.

Regards, Stepan