[Moller] Senate budget markup

Jay Benesch benesch at jlab.org
Mon Sep 16 12:51:25 EDT 2019


https://www.appropriations.senate.gov/download/fy2020-energy-and-water-development-appropriations-act-report-116-102

NP starts on page 116 of pdf.  Quoting top of page 117

The Committee also recommends $28,500,000 for early oper-
ations at FRIB. This funding is necessary to meet the planned lev-
els as defined by the Department of Energy-Michigan State Univer-
sity cooperative agreement. Within major items of equipment and
other project costs, the Committee recommends $1,500,000 for the
Stable Isotope Production Facility; $10,200,000 for the Gamma-Ray
Energy Tracking Array; $9,520,000 for sPHENIX;

  $5,330,000 for MOLLER;

$5,000,000 for Ton-Scale Neutrino-less Double Beta
Decay; $10,000,000 for the Electron Ion Collider; and $1,000,000
for the High Rigidity Spectrometer.

The Committee further recommends optimal operations at the
Relativistic Heavy Ion Collider, Continuous Electron Beam Accel-
erator Facility, the Argonne Tandem Linac Accelerator System, and
the Brookhaven Linac Isotope Producer Facility.

also

SCIENCE LABORATORIES INFRASTRUCTURE
The Committee recommends $394,000,000 for Science Labora-
tories Infrastructure.

	Which is interesting given the recent job posting of a project engineer 
for CC and ARC rebuild/add.