[Moller_intdet] Fwd: Re: First Detector Group Meeting
Michael Gericke
mgericke at jlab.org
Fri Apr 24 10:54:58 EDT 2015
Hi everyone,
Here are some slides from Dustin regarding the Mainz beam test plans.
From the UofM, we have two Moeller ring LG geometries completed and being
cosmic ray tested and two super-elastic ring LG geometries being
completed and
ready for cosmic ray testing (sorry, no slides). The prototypes should
be ready to
ship to Mainz in the next two weeks.
The remaining issue for us is the interface structure with the Mainz
setup, but
Dustin and myself are communicating with Kathrin about this. We need to make
sure that the assembly fits; the super-elastic assembly, in particular,
is almost a
meter long.
Talk to you in a few minutes.
Michael
-------- Forwarded Message --------
Subject: Re: [Moller_intdet] First Detector Group Meeting
Date: Fri, 24 Apr 2015 08:41:24 -0600
From: Dustin McNulty <mcnulty at jlab.org>
To: Michael Gericke <mgericke at jlab.org>
Hi Michael,
I attached some slides for discussion of ISU plans at Mainz.
Best,
Dustin
On 4/24/15 12:45 AM, Michael Gericke wrote:
> Hi everyone,
>
> I apologize for, yet again, having forgotten to send an early reminder,
> but we will have
> our bi-weekly phone conference at 10:00 am central. There may not be
> much new to
> discuss, but I know that several of us are busy preparing for the
> upcoming beam tests
> in Mainz, so we can talk about that.
>
> If anyone has any material they want to show or any other agenda items,
> please
> e-mail them.
>
> I promise I will become more organized with announcing the meetings in a
> timely
> way (after setting myself a reminder in my calender) my semester is
> ending, so I
> will become more focused after that.
>
> Dial in instructions:
>
> From North America: 1.866.261.6767
> Other International Toll-free: (+)0080045622524
> Other International Toll: (+)416.850.2050
>
> Participant code: 64662545#
>
> Thanks,
>
> Michael
>
>
>
> On 2015-04-09 7:41 PM, Michael Gericke wrote:
>> Dear Colleague,
>>
>> According to those who have participated in the poll to schedule regular
>> phone meetings for MOLLER integrating detector development, it seems
>> that tomorrow, Friday, at 10:00 am central works best to have a first
>> meeting.
>>
>> I think the first meeting should be primarily about organizing the group.
>> Here is a suggested loose agenda (not exclusive and not necessarily in
>> this order).
>> If you have items to add just respond to this message.
>>
>> 1) Update everyone on the status of development (who is doing what)
>> - Idaho
>> - Manitoba
>> - Ohio
>> - Stony Brook
>> - Syracuse
>> - W&M
>> - New efforts at other places ?
>> 2) Organization of regular phone meetings
>> 3) Short organizational discussion about the upcoming beam tests in Mainz
>>
>> I think this is all we can realistically get through in an hour.
>>
>> In future meetings, I think the overarching goal of the group should
>> be to address the
>> following open issues:
>>
>> - simulations of background in the detector region
>> - realistic detector design (geometries, etc.), mounting design,
>> and shielding, based on simulations with background
>> - determination of actual detector rates (with the above accounted
>> for)
>> - efficiency expectations for the "other" rings (e-p, inelastic,
>> super elastic, etc.)
>> - prototype design and testing of the shower max detectors
>> - prototype design and testing of the pion detectors
>> - electronics needs for every detector (PMTs, ADCs, etc.)
>> - other stuff that I am forgetting ...
>>
>> Here is the call-in information:
>>
>> From North America: 1.866.261.6767
>> Other International Toll-free: (+)0080045622524
>> Other International Toll: (+)416.850.2050
>>
>> Participant code: 64662545#
>>
>>
>> Talk to you tomorrow.
>>
>> Cheers,
>>
>> Michael
>>
>>
>>
> _______________________________________________
> Moller_intdet mailing list
> Moller_intdet at jlab.org
> https://mailman.jlab.org/mailman/listinfo/moller_intdet
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/moller_intdet/attachments/20150424/ac1e9b40/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: testbeam2015May_plans.pdf
Type: application/pdf
Size: 391829 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/moller_intdet/attachments/20150424/ac1e9b40/attachment-0001.pdf
More information about the Moller_intdet
mailing list