[Nps] Minutes from the RG1a NPS analysis meeting of July 3, 2024
Carlos Munoz Camacho
munoz at jlab.org
Wed Jul 3 18:16:30 EDT 2024
*Minutes from the RG1a NPS analysis of July 3, 2024*
*Meeting Recording: *
https://jlab-org.zoomgov.com/rec/share/Npd4ZGnny4jtsjePMIFA2ClCNGFsLv98lfIRbi4AHC-_uoVkvPHJ9G3_wrxEwcXi.rr6SOGJD9rglbizt
Passcode: X1$bTeP?
Josh (slides at
https://hallcweb.jlab.org/elogs/NPS-RG1a-Analysis/240702_183320/Run_List_Status_7-2-24.pdf
)
===========
- Presented the status of the run list.
- Basic identifiers for good/bad criteria were discussed. They are
currently obtained from automatic scripts (do not rely on manual logging).
- Discussed Peter's run list, which primarily uses scaler data as
criteria, but not only.
- Discussion on formatting of the list and possible addition of extra
columns to the file (discussion to be continued).
Avnish (slides at
https://hallcweb.jlab.org/elogs/NPS-RG1a-Analysis/240703_010443/NPS_RG1_analysis_Jul3_23.pdf
)
============
- Presented status of the HMS DC calibration
- Discussion on what other detectors should be calibrated first (C.
Yero's technical note or thesis are a good reference as a starting point:
see, e.g.,
https://hallcweb.jlab.org/DocDB/0010/001032/001/analysis_notes.pdf).
- Once other detectors and time cuts are optimized, this will be redone.
- Calibration will need to be done several times during the run period.
Yaopeng (slides at
https://hallcweb.jlab.org/elogs/NPS-RG1a-Analysis/240703_040917/DC_Calibration_Updates_July_03.pdf
)
============
- Presented also DC calibration results.
- The same main conclusions apply (see Avnish's talk).
Casey
=============
- Discussed how to use hcana in ifarm using a common software version
for everyone.
- He will post instructions in the wiki.
Hao (slides at
https://hallcweb.jlab.org/elogs/NPS-RG1a-Analysis/240703_073201/20240703_Status_of_the_calibration_for_NPS.pdf
)
==============
- Presented the status of the pi0 calibration.
- A few minor issues are still under analysis.
- The required frequency of calibrations will be investigated.
- The focus now is on developing the procedure; calibrations will need
to be redone once waveform analysis on calorimeter data is performed.
Wassim (slides at
https://hallcweb.jlab.org/elogs/NPS-RG1a-Analysis/240703_095221/Neutron_Peak.pdf
)
===============
- Presented the status of the pi0 and DVCS missing mass distributions
after waveform analysis.
- Normalized LD2-LH2 distributions are presented.
- The (LD2-LH2) DVCS missing mass distribution shows a higher number of
events than LH2 alone, which would be surprising if real — probably related
to the LH2 target density issue.
.
The next meeting will be on Thursday, July 11 at 4PM ET:
https://jlab-org.zoomgov.com/j/1618547387?pwd=S1BmQ1cwZFBYV3l5TnArK3hCaUZwQT09
Meeting ID: 161 854 7387
Passcode: 031040
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/nps/attachments/20240704/539000c8/attachment.html>
More information about the Nps
mailing list