[Nps_daq] [EXTERNAL] Analysis tasks
Alexandre Camsonne
camsonne at jlab.org
Thu Jul 28 10:08:59 EDT 2022
Hello,
I could make it finally to NPS meeting DAQ/analysis since EIC users
meeting going on.
It seems the scripts for cosmics and calorimeter display are done already,
I think still needs to do the fitting part and generate HV to gain
match the calorimeter still need to be done but maybe Pramita will
work on it.
On short/medium term, Brad was advising Zhenyu to work with Paul on ET
online display so I think he can get started on this.
There are other tasks Zheng or another DVCS student could work on, I
think could be useful :
-HMS analysis : Cerenkov, shower calibration
-beamline calibration
-calorimeter e/p calibration
-calorimeter LED calibration
-DIS cross section ( ideally we want to have that when were are running )
-calorimeter pi0 calibration
-DVCS missing mass plots
-DC current monitoring of bases using FADC ( not sure if we can do
that with our bases (AC or DC coupled ? )
but I think it is done in some way in Hall B
can we add those to the list and assign students to them.
-start of run / end of run information
-EPICS logger
-asymmetry plots
I was talking to Hyon Suk when I was in Korea he might consider having
a student on Hall C NPS too.
Alexandre
More information about the Nps_daq
mailing list