[On_site_list] Section of CEBAF Blvd. on Accel. Site Closed Jan. 4-5
deborah magaldi
magaldi at jlab.org
Tue Jan 3 11:38:04 EST 2012
A section of CEBAF Blvd. – the two-lane road through the middle of the
Accelerator Site – will be closed Wednesday and Thursday, Jan. 4-5, for
the delivery and installation of equipment to CEBAF's Central Helium
Liquefier (CHL), Building 8. The section of road and sidewalk – from
about the southwest corner of Building 87 to about the front door of
Building 89 – will be closed.
During this time, traffic will be directed with cones and/or signs to
the one-way Accelerator ring road – also known as Bohr Blvd. North (over
the North Linac) and Bohr Blvd. South (over the South Linac).
Pedestrians wishing to pass through that area will need to walk along
the ring road or along the north side of Buildings 87 and 89.
The area in front of the CHL will be considered a construction zone.
Access to the area will be restricted to authorized personnel and will
require specified personal protective equipment.
Individuals needing more information may contact Bill Hunewill or Scott
Thompson, Engineering Division.
Please note the slight date change for this temporary road closure.
Regards,
Deb Magaldi
JLab Public Affairs
x5102
More information about the On_site_list
mailing list