<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta http-equiv="content-type" content="text/html;
charset=ISO-8859-1">
</head>
<body text="#000000" bgcolor="#ffffff">
The South Connector Road (fronting CEBAF Center and including the
CEBAF Center Circle) will be closed Monday and Tuesday, Aug. 22 and
23. The road will be closed from Lawrence Drive to the CEBAF Center
parking lot entrance.<br>
<br>
Please use the North Connector Road or Hogan to Rattley Road/Hadron
Drive to access CEBAF Center, the EEL, Test Lab and Accelerator
Site.<br>
<br>
The subcontractor, Mortenson Construction, will be cutting asphalt
and installing the new entrance to the walkway that will run between
CEBAF Center and the TEDF Project. The road will re-open soon as the
job is complete.<br>
<br>
SOTRs: Please notify your subcontractors of this temporary road
closure.<br>
<br>
Questions and requests for additional information may be directed to
Keith Royston, Facilities Management & Logistics, at: <a
class="moz-txt-link-abbreviated" href="mailto:royston@jlab.org">royston@jlab.org</a><br>
<br>
Information about this and other utilities and services outages are
posted on the FM&L Outage Management System webpage at: <a
class="moz-txt-link-freetext"
href="http://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView">http://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView</a><br>
<br>
The sidewalk on the west side of the EEL will remain open.<br>
<br>
<i>This message is being sent on behalf of Facilities Management
& Logistics.</i><br>
<br>
<span style="font-size: 12pt;">Thank you,<br>
Deb Magaldi<br>
Jefferson Lab<br>
Public Affairs<br>
x5102</span><br>
<br>
</body>
</html>