<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    <font face="Arial"><big><u>Sent on Behalf of Facilities Management</u><br>
        <br>
        Concrete stoops will be constructed at the exterior exit doors
        for wings A, B &amp; C of CEBAF Center.
        <br>
        <br>
        These exit doors will remain closed </big><big>during
        construction</big></font><big><big><font face="Arial"><small>,
            except for emergency exit, and all personnel will need to
            use other doors to enter and exit the building. <br>
            <br>
            The construction is scheduled to start on Thursday, Sept. 1
            and will be completed by Monday, Sept. 5, subject to
            weather.<br>
            <br>
            If you have any questions, please call or page Suresh
            Chandra of Facilities Management at x7248.<br>
          </small></font><br>
      </big></big>
  </body>
</html>