<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>
    <meta http-equiv="content-type" content="text/html;
      charset=ISO-8859-1">
  </head>
  <body text="#000000" bgcolor="#ffffff">
    A section of CEBAF Blvd. &#8211; the two-lane road through the middle of
    the Accelerator Site &#8211; will be closed Tuesday through Thursday, Dec.
    6-8, for the delivery and installation of large compressor units to
    CEBAF's Central Helium Liquefier (CHL), Building 8.&nbsp; The section of
    road and sidewalk &#8211; from about the southwest corner of Building 87
    to about the front door of Building 89 will be closed.<br>
    <br>
    During this time, traffic will be directed with cones and/or signage
    to the one-way Accelerator ring road &#8211; also known as Bohr Blvd.
    North (over the North Linac) and Bohr Blvd. South (over the South
    Linac). Pedestrians wishing to pass through that area will need to
    walk along the ring road or along the north side of Buildings 87 and
    89.<br>
    <br>
    Use caution while driving or walking on the Accelerator Site during
    this time as the Accelerator ring road will experience a higher
    volume of traffic than normal, and visibility can be impaired by
    large vehicles, buildings and reduced daylight hours. Also, keep in
    mind that the road over the northeast section of the East Arc
    remains closed for Hall D Complex construction work.<br>
    <br>
    This link is to the JLab site map:
    <a class="moz-txt-link-freetext" href="http://wwwold.jlab.org/visitors/visiting/map1.html">http://wwwold.jlab.org/visitors/visiting/map1.html</a><br>
    <br>
    While the area in front of the CHL is closed it will be considered a
    construction zone. Access to the area will be restricted to
    authorized personnel and require wearing specified personal
    protective equipment.<br>
    <br>
    Be advised that this situation will be repeated immediately after
    the holiday shutdown, Jan. 3-5, 2012, when additional oversized CHL
    equipment arrives.<br>
    <br>
    This work is a critical part of the CHL upgrade, which is part of
    the 12 GeV Upgrade project.<br>
    <br>
    Individuals needing additional information may contact Bill Hunewill
    or Scott Thompson, Engineering Division.<br>
    <br>
    <i>This message is being sent on behalf of the Engineering Division
      and Facilities Management &amp; Logistics.</i><br>
    <br>
    <span style="font-size: 12pt;">Regards,<br>
      Deb Magaldi<br>
      Jefferson Lab<br>
      Public Affairs<br>
      ph. 269-5102</span><br>
    <br>
  </body>
</html>