<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body text="#000000" bgcolor="#ffffff">
Asphalt road patching work will take place Wednesday, Dec. 14 at the
intersection of Hogan and Rattley Roads; Rattley is the road leading
to the SURA Residence Facility and the east side of the CEBAF Center
parking lot and connects with Hadron Drive<br>
<br>
Traffic will be reduced to one lane while the repair work on Rattley
is underway.<br>
<br>
After completing the Rattley Road repair, the subcontractor plans to
carry out repair work on the South Connector Road near the CEBAF
Center parking lot. (The South Connector Road parallels the front of
CEBAF Center.)<br>
<br>
Please be patient and heed all signage and flag workers. To avoid
road repair work areas, take Hogan or Onnes to Lawrence and turn
onto the North Connector Road, or take Hogan to Hofstadter Road
while repair work is underway.<br>
<br>
This link takes you to a JLab Site Map:<br>
<a class="moz-txt-link-freetext" href="http://wwwold.jlab.org/visitors/visiting/map1.html">http://wwwold.jlab.org/visitors/visiting/map1.html</a><br>
<br>
<i>This message is being sent on behalf of FM&L.</i><br>
<br>
Regards,<br>
Deb Magaldi<br>
Jefferson Lab<br>
Public Affairs<br>
ph. 269-5102
</body>
</html>